Calendar

Август 2018
MTWTFSS
« Dec  
 12345
6789101112
13141516171819
20212223242526
2728293031 

modernization of Arzamas

February news from Arzamas Machine-Building Plant. Now they can, will be easier to grind out the APCs 😉

Replenishment

In the machine assembly shop number 1 arrived 2 machining centers with CNC: vertical turning, milling and boring — 800VT and drilling, milling and boring — 650H.

These are the first two of the ten machining centers acquired in the framework of the investment project to develop serial production of upgraded armored cars. 8 more turning and milling, milling and boring center will be transferred to the company as they are shipped from the factory in the near

Continue reading modernization of Arzamas

Gold production in Russia in January-August increased by 15.1%

Gold production in Russia in January-August increased by 15.1% yoy to 155.815 tons. It is a question of the gold, and the gold obtained by passing the non-ferrous metals, recycling of scrap, waste and gold concentrates, According to Russian Union of Gold. 

Gold mining of mineral resources for the eight months increased by 8.8% to 130.417 tons, passing production grew by 4.2% to 10,644 tonnes. In August, gold production increased by 10.1% (to 2,602 tons), the chairman of the Union Sergei Kashuba.

  Union predicts a gold mining and production in Russia in 2013 at

Continue reading Gold production in Russia in January-August increased by 15.1%

At the Zlatoust Machine-Building Plant tested the newest of positioner for telescopes on defense subjects.

At JSC "Zlatoust Machine-Building Plant" have passed the preliminary tests of the newest of positioner for telescopes on defense subjects. To the test developers have come — the representatives of JSC "SPC" Systems Precision Instrument "(Moscow), JSC" Special Machine Building Design Bureau "(St. Petersburg) and St. St. Petersburg University of Information Technologies, Mechanics and Optics. Work perspective — so it is attention.

Engineering design of the product existed only in the form of a drawing. The specialists of "Zlatmash" make it happen. Rotary support is an integral part of a powerful optical-electronic complex for space control.

Continue reading At the Zlatoust Machine-Building Plant tested the newest of positioner for telescopes on defense subjects.

CJSC Mint timber opened in Sverdlovsk Region workshop producing arbolita

CJSC "Mint timber" launched in the village Mint Berezovsky urban district, Sverdlovsk region a new shop for recycling a timber production.

Construction of the plant started in March 2013. Today, the new equipment purchased Zlatoust, the company began to produce pilot-scale production of wood chips and cement — derevobeton arbolit and paving tiles.

"Now we are engaged in product certification for its further implementation. While working in the shop, only about a dozen people. In the future the number of employees will be increased to forty. Pilot-scale production, which lets shop we use for personal

Continue reading CJSC Mint timber opened in Sverdlovsk Region workshop producing arbolita

Izhora plants to supply equipment for the second stage of Tianwan

Izhorskij industrial complex a delegation of the Ministry of Environment of China headed by Director General of the Department of Nuclear Safety Chenem Jinyuan. As the press service of the St. Petersburg company, the guests visited the metallurgical and engineering workshops Izhorskogo industrial complex and had a chance to see all the stages of of nuclear equipment for the second stage of Tianwan NPP in China.

In the Research Center Izhora Plants guests were shown the possibility of research and testing facilities Izhorskogo production complex.

Dlinnotsiklovoe equipment for the second stage of Tianwan NPP was

Continue reading Izhora plants to supply equipment for the second stage of Tianwan

Omsk Oil Refinery Gazprom oil has begun production of gasoline Class 4

Omsk Oil Refinery, owned by OAO "Gazprom Neft", started production of gasoline, a Class 4 of the Technical Regulations on motor fuels. This was reported by "Gazprom Neft".

Deputy General Director Anatoly Cherner, quoted in the report, said: "Gazprom oil" is consistently implementing an extensive program of modernization of its refining assets, one of the most important goals is to improve the quality of motor fuels.

Commissioning of "Isomalk-2" and the start of production at the Omsk refinery isomerisate allowed the plant to the production of high-octane gasoline grade 4 according to its parameters with

Continue reading Omsk Oil Refinery Gazprom oil has begun production of gasoline Class 4

The Tuapse refinery completed the first phase of modernization of production

Photo: Alexander Anosov / WP

Modernization of Tuapse refinery — is actually build a new refinery without stopping the current production. Reconstruction of the plant will significantly increase the volume of oil from 4.5 million to 12 million tons a year, increase the depth of from 54 to 98.5 per cent and go to the output corresponding to the environmental class "Euro-5".

October 11 put into operation the most powerful Russian setting of primary oil refining CDU VDU 12. Starting the installation completes the first phase of modernization, which includes also large objects such as parks

Continue reading The Tuapse refinery completed the first phase of modernization of production

KAMAZ-5490: issue began

KAMAZ-5490: issue began

October 9 automobile factory assembly line "KAMAZ" came the first production of KAMAZ-5490. A start working out mass production of the main prime mover, which is to become the leader of this segment of KAMAZ production.

KAMAZ-5490 has already been presented to the public at the International Exhibition "Comtrans 2013", which caused a lot of positive feedback from both ordinary visitors and potential customers. A distinctive feature of the long-haul tractor will stall, which departs from cabin Mercedes-Benz family of Axor. The modern design and its streamlined shape will significantly improve not

Continue reading KAMAZ-5490: issue began

Four new ship launched Pskov Boat shipyard to its

anniversary

The walls of the Pskov Kremlin passed sea trials of the new boat "Courier", production of which has mastered this year JSC "Pskov Boat shipyard." About this Pskov Information Agency said Director Vladimir stockings.

Photo: Boat Photo: Boat

 The project is commissioned by the shipyard has developed well-known designer from St. Petersburg B. Yershov. "Thanks to the special shape of the case," Courier ", despite his solid 8-meter length, planing at high speed even at low engine power — enough motor boat in the 40-60 horsepower", — said V. stockings. At the 2014 firm "Dory" from

Continue reading Four new ship launched Pskov Boat shipyard to its

In the Astrakhan region to build a plastic package

Astrakhan, 11.03.2011g. In Astrakhan Region will begin production of polyethylene. Design and evaluation work will start already in the III quarter of 2011, according to the Prime Minister of the Astrakhan region.

The readiness of the region to build a complex for the production of polyethylene said Deputy Chairman of the Board of "Gazprom" A. Ananenkov at a meeting with the Vice-Governor K.Markelovym.

Idea Factory was born a few years ago. In 2008, the Government presented a set of Astrakhan region as a sufficiently effective investment project. The possibility of building has been discussed at meetings

Continue reading In the Astrakhan region to build a plastic package

SQL - 6 | 2,439 сек. | 8.53 МБ