In Novocherkassk (Rostov region). Renovated pool opened SRSTU

Water complex was built 40 years ago and since then has never capitally not repaired. Under the federal program "500 pools" for 10 months builders have replaced the pool basin, the ventilation system, water treatment and water supply, roofing and windows.

This is the first in the Russian pool, which was renovated under the program "500 pools" rather than built from scratch. It can train athletes in almost all water sports — polo, aqua aerobics, synchronized swimming. 

Continue reading In Novocherkassk (Rostov region). Renovated pool opened SRSTU

In Novosibirsk, after the repair has opened a kindergarten for 210 children

In the Kirov district of Novosibirsk, the grand opening of the kindergarten № 408 "Zhemchuzhinka" after a year and a half overhaul ..

.

The walls are insulated and reinforced with metal design, replacing outdated heating system, water supply and sewerage systems. In addition, the built food and medical units, laundry, music and gymnastic halls, upgraded playground. As a result, a comprehensive overhaul managed to increase the number of seats in kindergarten from 160 to 210. In general, the repair of the building from the city budget has been allocated more than 77 million rubles.

+2

Continue reading In Novosibirsk, after the repair has opened a kindergarten for 210 children

In Nizhny Tagil (Sverdlovsk region). Opened a new kindergarten

Feb. 16 in the district of Nizhny Tagil Murinskaya ponds inaugurated a new children's garden.

Kindergarten "The Mansion" was built in the shortest possible time by using the most modern technologies. The builders did their best to facilitate the further work of the kindergarten staff, creating a separate building, occupying large areas of units: administrative, security, laundry and kitchen. Children who will be attending this preschool educational institution, are expected not only equipped with all the necessary equipment of spacious and comfortable rooms, but also sports and assembly halls of 100 square meters. meters each. The new institution

Continue reading In Nizhny Tagil (Sverdlovsk region). Opened a new kindergarten

In Nizhny Novgorod after the cap. Repair opened a maternity hospital number 4

Maternity hospital number 4 solemnly opened after renovation in Nizhny Novgorod on April 22.

The cost of work performed was 93.6 million. In addition, the program for hospital number 4 purchased 63 units of modern equipment in the amount of 31.9 million rubles.

As part of the program "Modernization of health care" in 2011-2012 to renovate and equip health facilities Nizhny Novgorod sent 10.8 billion. As a result of the program renovated 394 health facilities, purchased nearly 10,000 pieces of equipment. 

Maternity hospital number 4 for up to 161 beds, located in a building built

Continue reading In Nizhny Novgorod after the cap. Repair opened a maternity hospital number 4

What a man on Mars?

23.03.2011

Contrary to popular belief, its first interplanetary manned program Sergei Korolev dedicated flight is not close to the moon and on Mars far. As reported in "Echo of the Planet" in the past year, he has been forced to alter the project in the Martian moon, for reasons not related to technical problems. Decades have passed and the dream, never strays from humanity reborn.

"Now the ship with iron precision slowed in the upper atmosphere of Mars. He was still the epitome of beauty and power. Through

Continue reading What a man on Mars?

In Nelidovo (Tver region). Reconstruction after a children’s clinic

February 20 in Nelidovo renovated building opened in children's clinics. Overhaul of the building was carried out in the framework of the modernization program of health care. The volume of work performed quite impressive. This is a replacement roof, facade renovation, landscaping of the adjacent territory.

In addition, thorough exchange of engineering life-support systems of the building with modern materials and equipment. In accordance with the requirements for people with limited mobility made an entrance lobby and redesigned separate offices. The premises are fitted out clinic walls, ceilings, floors arranged new durable. Replacement of windows and doors.

Continue reading In Nelidovo (Tver region). Reconstruction after a children’s clinic

In Nagaybakskom district of Chelyabinsk region has opened three offices GP

Under the program of modernization of health care carried out repair works in Arsinskom, Balkan and Kassel obstetric units, on the basis of which the opening of the center of general practice.

First Balkan people, Kassel and Arsinskogo settlements were able to conduct a series of studies directly at the place of residence (electrocardiography, spirometry, pulse oximetry, blood biochemical tests, etc.).

In the offices of purchased machines "Field" for visits to the place of the emergency, accident and travel on fixed-term challenges to seriously ill patients in remote locations. For each of its officers attached to 1200 inhabitants, the

Continue reading In Nagaybakskom district of Chelyabinsk region has opened three offices GP

In Naberezhnye Chelny after the cap. Repair opened Perinatal Center

Repair perinatal center area of 13.5 thousand square meters began in August 2011. The result was completely renovated water supply, sewerage, and the electrical system of ventilation.

The program "Accessible Environment" made ramps, entrance, elevators, chambers with facilities for women with disabilities. According to the program of energy saving renovated facade, insulated space, installed LED lights.

Investment in the Perinatal Center was 381 million rubles. When repairs are strictly adhered to uniform standards, which are held in Naberezhnye Chelny in the reconstruction of the emergency hospital.

For pregnant women there are all the amenities: Triple Chamber, good conditions for

Continue reading In Naberezhnye Chelny after the cap. Repair opened Perinatal Center

In Naberezhnye Chelny opened a new kindergarten

In Naberezhnye Chelny (Tatarstan), the opening of a new center of development of the child "Belekech", built by the same name by the national program.

 Photo source:nabchelny.ru

In kindergarten, there are two pools, a dance hall, educational and sporting facilities. Each group is furnished with eco-friendly and aesthetic furniture, interactive boards. In the study of Tatar guests were acquainted with the variation form of the Tatar language teaching with the use of interactive whiteboards, video and audio materials.

 Photo source:nabchelny.ru

By the way, the presented program designed Chelninsky teachers. Under this program, the tutor in the

Continue reading In Naberezhnye Chelny opened a new kindergarten

KFK missile tests

German Branch euro missile Association MBDA (MBDA Germany) on October 17 2012 announced a year at the site in Baumholder (Germany) 2-the first successful test launches compact guided missile demonstrator program there by KFK (Kleinflugkorper — small rocket). Both were produced starting September 19 in native mode with the towing launcher.

The program KFK, with MBDA and funded by the German government, to this announcement developed under secrecy about it until now not a lot of that is clear. MBDA reports that on programmke KFK provides for a multi-purpose portable portable compact high-precision missile system designed mostly for operations in

Continue reading KFK missile tests

SQL - 16 | 1,339 сек. | 7.3 МБ