Calendar

Январь 2018
MTWTFSS
« Dec  
1234567
891011121314
15161718192021
22232425262728
293031 

Incomprehensible formation on the skin: what to do?

Almost all the people on the skin, there are small cosmetic defects of different types and sizes. Some of them are safe, but not very aesthetic, the other is better to quickly get rid of. To understand how to include your own, consult an experienced beautician, a dermatologist.

Remove all the excess skin from the best in the winter — the lack of sunlight and heat will allow the process of healing take place peacefully.

Growths on the skin that removes cosmetologist, are divided into two groups:

those in which the occurrence of fault infection Benign enlargement of any

Continue reading Incomprehensible formation on the skin: what to do?

Need removal of all Democratic candidates immediately

  Hurt: "If the strategy is seriously open a discussion of common action in this company, it would be ready by this time, and determined to including for such a situation. I mean Removing all the candidates at once. It would be a colorful event — I would not even referred to her boycott and demonstration of their own abilities and the illegitimacy of these elections. But it seems as present day and based on the practice past years, on my eyes, will not. Maybe someone will act. But organized declared withdrawal of candidates will not happen. "

Tags: Elections

(function (w, doc) {
if (!w.__utlWdgt) {
w.__utlWdgt = true;
var d = doc, s = d.createElement(‘script’), g = ‘getElementsByTagName’;
s.type = ‘text/javascript’;
s.charset = ‘UTF-8’;
s.async = true;
s.src = (‘https:’ == w.location.protocol ? ‘https’ : ‘http’) + ‘://w.uptolike.com/widgets/v1/uptolike.js’;
var h = d[g](‘body’)[0];
h.appendChild(s);
}
})(window, document);

Water iron removal plant opened in Odintsov

In Odintsov open water iron removal plant. This event waited for many years the people of the city, the apartments are a long time out of the taps flowing yellow-orange water.

As the General Director Vitaly Ivanov Odintsovsky water utility, the station was built in a short time, for two months. For its construction have spent 12 million rubles. Commissioning of the new facility will improve the quality of water in people's homes Odintsov.

(function (w, doc) { if (!w.__utlWdgt) { w.__utlWdgt = true; var d = doc, s = d.createElement(‘script’), g = ‘getElementsByTagName’; s.type = ‘text/javascript’; s.charset = ‘UTF-8’;
s.async = true;
s.src = (‘https:’ == w.location.protocol ? ‘https’ : ‘http’) + ‘://w.uptolike.com/widgets/v1/uptolike.js’;
var h = d[g](‘body’)[0];
h.appendChild(s);
}
})(window, document);

The first phase of water iron removal plant started operations in Kursk

 Photo source:k46.ru

Commissioned the first phase of construction of iron removal station, the construction of which is under the framework of the long-term program "Improvement of water supply of the city of Kursk" in 2009, REGNUM correspondent was informed on November 29, the press service of the city administration.

The estimated cost of the project — more than 900 million rubles. The total amount of funding for the work of the federal, regional and municipal budgets amounted to three years more than 400 million rubles. The design capacity of the facility to the complex engineering structures — 130

Continue reading The first phase of water iron removal plant started operations in Kursk

Water iron removal plant opened in Odintsov

In Odintsov open water iron removal plant. This event waited for many years the people of the city, the apartments are a long time out of the taps flowing yellow-orange water.

As the General Director Vitaly Ivanov Odintsovsky water utility, the station was built in a short time, for two months. For its construction have spent 12 million rubles. Commissioning of the new facility will improve the quality of water in people’s homes Odintsov.

(function (w, doc) { if (!w.__utlWdgt) { w.__utlWdgt = true; var d = doc, s = d.createElement(‘script’), g = ‘getElementsByTagName’; s.type = ‘text/javascript’; s.charset = ‘UTF-8’;
s.async = true;
s.src = (‘https:’ == w.location.protocol ? ‘https’ : ‘http’) + ‘://w.uptolike.com/widgets/v1/uptolike.js’;
var h = d[g](‘body’)[0];
h.appendChild(s);
}
})(window, document);

The first phase of water iron removal plant started operations in Kursk

 Photo source:k46.ru

Commissioned the first phase of construction of iron removal station, the construction of which is under the framework of the long-term program "Improvement of water supply of the city of Kursk" in 2009, REGNUM correspondent was informed on November 29, the press service of the city administration.

The estimated cost of the project — more than 900 million rubles. The total amount of funding for the work of the federal, regional and municipal budgets amounted to three years more than 400 million rubles. The design capacity of the facility to the complex engineering structures — 130

Continue reading The first phase of water iron removal plant started operations in Kursk

Kramatorsk filled up with snow

Heavy snowfall, which began on the night of Monday to Tuesday, gave public utilities Kramatorsk to smoothly enter into posleprazdnichny mode.

According to the head of Vladimir UZHKH Falchenko, Tuesday morning on the streets of cities and towns are 9 units.

"Snow removal, we started on time, — he said. — Five cars URSAS and four PS DRSU first sprinkled the road, and then clearing."

Mayor Gennady Kostyukov instructed to organize snow removal because of warming in the coming days is expected. "To not snowdrifts piled along roadsides, it is necessary to take out the snow in time," — said

Continue reading Kramatorsk filled up with snow

The energy of triumph

June 15, 1988 from the Baikonur Cosmodrome successfully launched into space in the world's most powerful energy booster. It was designed in the same podlipkinskom KB running General Designer Victor Petrovich Glushko. Energy could withdraw into space payloads of up to 100 tons — 2 train car! And, although the decision of the Government of the USSR, it was intended for launching our Buran reusable spacecraft, the missile was versatile and could be used for missions to the moon and other planets.

Undercover forgotten victories. The energy of triumph

From 1975-1977. in the process of creating rockets

Continue reading The energy of triumph

Removal of moles and warts

Specialist for permanent scars, as well as moles and warts is called dermatology and beautician. He has to have a medical degree and undergo specialized in dermatology and dermatology and cosmetology. Best of all, if the place where you go over the "skin defect" is a famous institution or beauty salon with a solid reputation.

By the way, the optimal time for such surgery — autumn. In the summer, in the heat, there is a risk of inflammation operated stations. In winter and spring the body is weakened, his immune system is not enough for a quick and

Continue reading Removal of moles and warts

MINSK, July 18 Russia and Belarus signed a general contract for the construction of nuclear power plants. According to RBC, the construction of two-unit nuclear power plants of Russian design capacity of up to 2,400 MW of Russia allocates a 15-year loan of $ 10 billion Image 4 of 157029 Construction work on the first unit is planned to complete in 2017, the commissioning is scheduled for 2018 . On the second block of time — in 2019 and 2020, respectively.

The contract was signed during the visit of Russian Prime Minister Dmitry Medvedev to Belarus.

Recall that the first nuclear power plant in Belarus will build on the Russian project "NPP-2006". The general contractor is the Russian company "ASE". In the project "NPP-2006" uses four channels active safety systems, overlapping, localization device melt system of passive heat removal from the reactor containment and passive heat removal system of the steam generators, hydrogen removal system, double containment of the reactor building and other technical solutions. None of the existing plants in the world is not equipped with such a configuration

Continue reading MINSK, July 18 Russia and Belarus signed a general contract for the construction of nuclear power plants. According to RBC, the construction of two-unit nuclear power plants of Russian design capacity of up to 2,400 MW of Russia allocates a 15-year loan of $ 10 billion Image 4 of 157029 Construction work on the first unit is planned to complete in 2017, the commissioning is scheduled for 2018 . On the second block of time — in 2019 and 2020, respectively.

SQL - 15 | 2,189 сек. | 8.4 МБ