Yaroslavsky CVD passed to the customer situational vessel Yury Sommer

8 August 2013 year at Yaroslavl Shipyard (management company "JSC "VP FINSUDPROM") After the successful completion of state acceptance tests cerebral vessel of situational SV2407 "Yuri Sommer" signed the acceptance certificate.

 

The state contract for the construction of a series of six vessels of this project for the Federal Agency of Maritime and River Transport under the "Update service fleet" plant signed on 26 December 2011. The designer of the vessel — CB "Technoflot" St. Petersburg. The vessel is designed for the control of the fairway on the inland waterways and waters towing non-powered

Continue reading Yaroslavsky CVD passed to the customer situational vessel Yury Sommer

In pictures: The second modernized A-50U in the new standard color

There are photos of the second series of modernized A-50U aircraft in gray. At JSC "Taganrog Aviation Scientific-Technical Complex Beriev" (Beriev) finished second serial modernization of aircraft airborne warning and control A-50 Russian Air Force variant of the A-50U.

The second series modernized A-50U aircraft was aboard the "Red 33". This aircraft (serial number 0043454618, serial number 41-05) was built in 1984, and entered on the upgrade of Beriev at the beginning of 2011. Currently machine is tested after the upgrade and is painted in the new colors of Russian Air Force.

The prototype

Continue reading In pictures: The second modernized A-50U in the new standard color

Cargo ship Neva-Leader 4 RSD49 project put into operation

«Nevsky Shipyard" (Shlissel'burg) July 15, transferred to the customer fourth cargo ship project RSD49 "Neva-Leader 4".

The customer a series of 10 vessels of RSD49 is JSC "North-Western Shipping Company."

All 10 bulk carriers should build a "Nevsky Shipyard", another 2 vessels RSD49 project being built by JSC "Shipyard" Lotus "(Narimanov) for the shipping company" Anship. "

The project is designed by the Marine Engineering Bureau (Ukraine).

Purpose:

Sea and mixed (river-sea) general cargo, bulk cargo, including steel, grain, wood, coal, large and heavy cargo,

Continue reading Cargo ship Neva-Leader 4 RSD49 project put into operation

Launched boat landing project 21820 for the Russian Navy

Today at JSC "Yaroslavsky Shipbuilding Plant" launched landing craft air-cavity "Denis Davydov" Project 21820 "dugong" (serial number 701).

clickable

 

The boat was designed in OAO "CKB by SEC them. RE Alexeyev "(Nizhny Novgorod)

The contract for the construction of a series of three boats of this project was signed between the open joint-stock company "Yaroslavsky Shipbuilding Plant" and the Ministry of Defense of Russia June 23, 2011

clickable

At the launching ceremony was attended by the heads of the boat and representatives:

Continue reading Launched boat landing project 21820 for the Russian Navy

Marine Yard Diamond launched the next patrol boat of the Sable

Photo source:narod.ru

September 1, 2011 on the territory of "Almaz Marine Yard" (St. Petersburg) held Launching border patrol boat (serial number 213) Project 12200 "Sable" for the Border Service of the Russian Federation.

The boat is used for Coast Guard search and rescue operations, the protection of marine resources, patrol and customs operations. This year is the third boat, which is preparing for the tests, the company reports. Previous boats serial number 211 and delivered to the customer serial number 212 after acceptance testing transported to the permanent stationing of Vladivostok.

Boat hull and superstructure are made

Continue reading Marine Yard Diamond launched the next patrol boat of the Sable

SNSZ carried on laying the sixth pusher project 81

23/08/13 at JSC "SNSZ" (part of JSC "United Shipbuilding Corporation") carried tab pusher Project 81 (serial number 816) is the sixth vessel in a series of six vessels delivered under contract with "P.TransKo" concluded in February 2013.

A distinctive feature of the ship is a friction coupling type ARTICOUPLER KVC3545 company Taisei Engineering Consultant Inc (Japan), allowing a significant mutual rocking tug and barge, which allows the use of a barge-towing structure in the near-sea area, as well as shortened the procedure coupling-uncoupling of tug-and-barge 30 seconds.

As a steering device has two full-circle rudder

Continue reading SNSZ carried on laying the sixth pusher project 81

New small missile ship Uglich went out of the factory on the Caspian Flotilla

Small missile ship (IRAs) "Uglich" 21631 Project began its transition to the Caspian Sea.

The lead ship of this project, "Hail Svijazhsk" is currently undergoing sea trials in the factory of the Caspian Flotilla.

By inland waterways to provide tug boat will be about 1.5 thousand km. Arrival of the ship to Astrakhan is expected in September.

Upon arrival at the Caspian Flotilla IRAs "Uglich" as well as "Hail Svijazhsk" will be all the steps factory and state tests in the Caspian Sea and will be included in the

Continue reading New small missile ship Uglich went out of the factory on the Caspian Flotilla

Yaroslavsky CVD passed to the customer situational vessel Yury Sommer

8 August 2013 year at Yaroslavl Shipyard (management company "JSC "VP FINSUDPROM") After the successful completion of state acceptance tests cerebral vessel of situational SV2407 "Yuri Sommer" signed the acceptance certificate.

The state contract for the construction of a series of six vessels of this project for the Federal Agency of Maritime and River Transport under the "Update service fleet" plant signed on 26 December 2011. The designer of the vessel — CB "Technoflot" St. Petersburg. The vessel is designed for the control of the fairway on the inland waterways and waters towing non-powered boats, cargo, setting

Continue reading Yaroslavsky CVD passed to the customer situational vessel Yury Sommer

Launched boat landing project 21820 for the Russian Navy

Today at JSC "Yaroslavsky Shipbuilding Plant" launched landing craft air-cavity "Denis Davydov" Project 21820 "dugong" (serial number 701).

clickable

The boat was designed in OAO "CKB by SEC them. RE Alexeyev "(Nizhny Novgorod)

The contract for the construction of a series of three boats of this project was signed between the open joint-stock company "Yaroslavsky Shipbuilding Plant" and the Ministry of Defense of Russia June 23, 2011

clickable

At the launching ceremony was attended by the heads of the boat and representatives: Control ship of

Continue reading Launched boat landing project 21820 for the Russian Navy

Cargo ship Neva-Leader 4 RSD49 project put into operation

«Nevsky Shipyard" (Shlissel’burg) July 15, transferred to the customer fourth cargo ship project RSD49 "Neva-Leader 4".

The customer a series of 10 vessels of RSD49 is JSC "North-Western Shipping Company."

All 10 bulk carriers should build a "Nevsky Shipyard", another 2 vessels RSD49 project being built by JSC "Shipyard" Lotus "(Narimanov) for the shipping company" Anship. "

The project is designed by the Marine Engineering Bureau (Ukraine).

Purpose:

Sea and mixed (river-sea) general cargo, bulk cargo, including steel, grain, wood, coal, large and heavy cargo,

Continue reading Cargo ship Neva-Leader 4 RSD49 project put into operation

SQL - 16 | 0,754 сек. | 7.24 МБ