Calendar

Февраль 2018
MTWTFSS
« Dec  
 1234
567891011
12131415161718
19202122232425
262728 

VOCAL FRY

An actress best known for playing the sweetly dorky production assistant who kept bumping into Ashton Kutcher in «No Strings Attached», Bell, who is thirty-four, has wide, still eyes, fidgety hands, and jittery feet. With many explanatory gestures, she explained how her childhood love of voices and recordings led her to write, direct, and star in the film «In a World» …, which opens this week. She plays Carol, a voice coach who’s trying to break into the macho world of movie trailer narration. Carol has talent, but her voice sometimes catches, from pressure or lack of confidence. The susceptibility

Continue reading VOCAL FRY

Appeal against the destruction of an old Grodno 789 people signed

As said Paul Mazhejka us earlier in the regional prosecutor’s complaint focused on several activists. However, the prosecutor’s office forwarded it to the Ministry of Culture.True appeal due to law contains references to documents, noted sire Mazhejka.Now before lunch about 10 young activists came to the steam mill in the center of town, which continue to destroy. Arrange over the phone. On-site for young expecting two police cars, and activists were obliged to retreat.Half destroyed steam mill end of the XIX century in the street Misha Cornflower

Dnieper-Busk channel: more asunder than connects

My acquaintance with covered with legends Dnieper-channel Busk came during the trial to get into the cut "artificial" water village. Given that other ways, such as ferry, there is no waiting for meeting with loaded up to the top of the barge, excursion boats. Reality was more worldly: on the other side of the empty channel in the queue for the ferry was a funeral procession. Next to me, waiting for passengers from the ferry, bus parked ritual office. Ferry — even in another world"Since there is no side of the cemetery, we only cemetery here — says a

Continue reading Dnieper-Busk channel: more asunder than connects

Grodno: marriage reception King

The ceremony takes place in the museum’s distinctive circular hall, which in the late tenthV

3rd century was the reception of the king. Is it worth 120 thousand rubles. In the first day married two couples.

Behind the back of the employee the registrar that registers the marriage, a copy of a self-portrait hanging Flemish artist Anthony Van Dyck. For participants playing stringed Chapel.

Correspondent

"With the New Castle comes first couple who registered marriage. Could hear the applause, the guests lined up in two rows on the stairs, they were thrown on the heads of young flower petals.

Continue reading Grodno: marriage reception King

Specialists — Belarusians about the chances at the Olympics

V.Barabanshchykava "Chinese as programmed bots"In 2000 in Sydney Olga Barabanschikova paired with Natalia Zveravay made their way to the semifinals of tennis tournaments and finished 4-bubbled. This year, says Olga Barabanschikova, medalevyya Belarusian tennis odds are very high. Unlike guys:"We must hope for the best. Pity that we have not developed a pair of Peace — top. I think the couple would be more likely. Well, in the midst of the ladies are very good performance of our two couples as" loner "- Azarenka. I know that Govortsova vs. Williams plays first wheel, so that’s not the best toss. tennis

Continue reading Specialists — Belarusians about the chances at the Olympics

Ural Turbine Works upgraded equipment Ust-Kamenogorsk CHP in Kazakhstan

JSC "Ural Turbine Plant" (JSC "UTP") has completed the modernization of the steam turbine T-100/120-130, which resulted in Ust-Kamenogorsk CHP (LLP "AES Ust-Kamenogorsk CHP," The Republic of Kazakhstan) has received updated power at the rate of 120 MW. Under the terms of the agreement, signed in December 2011, the specialists of JSC "UTZ" has been modernized turbine flow passage T-100/120-130.

During the work were replaced rotors of high and medium pressure blading held stator mounted cellular seal, allowing to extend the life of equipment for 200,000 hours, and improve the technical and economic performance.

Continue reading Ural Turbine Works upgraded equipment Ust-Kamenogorsk CHP in Kazakhstan

Ural Turbine Works produced a second steam turbine for CHP Novobereznikovskaya

In the framework of the priority investment projects of JSC "IES" construction Novobereznikovskaya TPS, on the Ural Turbine Plant finished making a second steam turbine T-40/50-8, 8. Steam turbines UTZ with General Electric gas turbines will form the basis of a new power plant — combined-cycle plant with total capacity of 230 MW.    Characteristics of steam turbine UTZ: power each — 40.2 MW speed — 3000 rpm; steam consumption — 165 tons / hour. Factory testing of turbines were successful, its delivery to the construction site Novobereznikovskaya CHP is expected in September 2013.

Currently in

Continue reading Ural Turbine Works produced a second steam turbine for CHP Novobereznikovskaya

In the XXI century, the U.S. has lost its own capacity to produce steam generators for nuclear power plants

Infantile Disorder San Onofre

Replacement of steam generators in nuclear power plants, "San Onofre" — the story lasting for years and cost billions of dollars. She opened the fundamental problems that have accumulated in the nuclear industry in the U.S..

Alloy 600

The structure of the NPP "San Onofre" includes two operating unit — the second and third. They work under the pressure of light water reactors PWR capacity of up to 1100 MW (e). The first unit of the plant with a PWR reactor at 456 MW (e) was finally stopped in 1992, and today serves as a repository

Continue reading In the XXI century, the U.S. has lost its own capacity to produce steam generators for nuclear power plants

Power Machines manufactured a steam turbine to NLMK

OAO "Kaluga Turbine Plant" OJSC ("GTC"), part of the company "Power Machines", manufactured and successfully tested a steam turbine with a capacity of 50 MW for "NLMK" (NLMK).

The contract for the supply of power of "GTC" signed with JSC "Power Corporation" Union "(Moscow) in February 2011. Under the terms of Kaluga plant will manufacture steam turbine T-50-8, 8/0, 12 50 MW, will deliver equipment NLMK and conduct supervision of erection and commissioning.

JSC "KTZ" Two years ago, delivered a series of three turbines of the same capacity for NLMK, however turbine T-50 — a new

Continue reading Power Machines manufactured a steam turbine to NLMK

On Ashalchinskoye expected to produce 100 thousand tons of heavy oil

On Ashalchinskoye JSC "Tatneft" from the beginning of development produced 94,000 tons of extra-viscous oil (EVO), until the end of 2011 is expected to produce more than 100 tons of SRI. Currently, 9 pairs of wells have been drilled, of which 7 were put into operation. Photo source:tatneft.ru

Pilot plant operation Ashalchinskoye is from 2006, when it used the modified steam assisted gravity technology dvuhustevye exposure through horizontal wells.

Feature of the development of deposits of extra-heavy oil is a need to develop and steam injection into the reservoir. For the further development of the field and increase

Continue reading On Ashalchinskoye expected to produce 100 thousand tons of heavy oil

SQL - 8 | 3,045 сек. | 8.37 МБ