Calendar

Август 2018
MTWTFSS
« Dec  
 12345
6789101112
13141516171819
20212223242526
2728293031 

In Novocherkassk developed a suit for training pilots on the ground

Novocherkassk trenazherostroiteli made the next step in the training program for pilots to work in open space.

Already prepared a special suit that simulates the movement in the vacuum of space in three directions.

A similar system is used in the Moscow center of the Gagarin Cosmonaut Training, but it works only in one dimension — up and down, Novocherkassk scientists have gone further — you can train the astronauts in three planes. In such circumstances, work out or moving multi-ton loads, for example, an artificial satellite.

 The new system Novocherkassk trenazherostroiteley

Continue reading In Novocherkassk developed a suit for training pilots on the ground

Magnesite Group has commissioned a gas-cleaning equipment

http://lentachel.ru/image/FHARnSERyNkh1HS2.jpg

The "magnesite" commissioned by Satka production site (Satka, Chelyabinsk region) gas treatment equipment according to the best world standards. The shop firing magnesite powder for rotary kiln number 4 is mounted a two-stage system with bag filter manufacturing Scheuch Gmbh (Austria). The efficiency of the filter is 99.9%. This is the seventh dust filters system installed in the shops of the Group for several years. Total investment in the project amounted to about 600 million rubles.  

This year, the same equipment is installed and running to work on high-temperature blast furnace Polysius AG, a rotary

Continue reading Magnesite Group has commissioned a gas-cleaning equipment

Modernisation of the Su-24 and Tu-22

A unified information system of army-first present at "MAKS-2013"

Aviation system will allow the bombers to get characteristics of fifth generation fighter aircraft

A unified information system of army-first present at "MAKS-2013"

Photo: Anatoly Rakhimbaev 

The first module of the national automated control system (ACS) will be presented to the troops at the air show "MAKS-2013" at the booth of JSC "Hephaestus and T". For the first time the general public will be shown in action work "brain" of the system — SVP-24 (a specialized computing subsystem) and its ground-based module.

Continue reading Modernisation of the Su-24 and Tu-22

Synergy-1 — a new diagnostic system of the Moscow metro (lots of pics)

photo by Alexander Popov Russos

Actively expand the subway network, the extension of existing lines and construction of new necessitated the development and implementation of modern diagnostic facilities underground way to improve the reliability of the main transport system of the city and the safety of passengers. To do this, commissioned by the Moscow Metro was created a unique set of diagnostic laboratory "Synergy-1", which will house all the necessary equipment to diagnose the state of track facilities.

August 8, 2013, the first work of the diagnostic check of the car "Synergy-1", in which

Continue reading Synergy-1 — a new diagnostic system of the Moscow metro (lots of pics)

NPOZvezda announced about the final test of the new on-board oxygen supply system

Russian fighter of the 5th generation will be presented at the MAKS-2011 Photo from airforce.ru

Fighter T-50 "Dry" is equipped with advanced computerized life-support systems, including systems with an unlimited supply of breathing oxygen and compensation systems overload.

Scientific and Production Enterprise "Star" announced about the final test of the new on-board oxygen supply system. Such a system will be installed on all existing fighter aircraft of the Russian Federation, including export models.

Unlike devyanostokilogrammovyh oxygen cylinders, new generator weighs about thirty pounds.

"Oxygen is produced from the air, the

Continue reading NPOZvezda announced about the final test of the new on-board oxygen supply system

Social and economic experiments in Shaymuratova

By entering the financial and economic system proposed by Silvio Gesell succeeded in 8 months to convey to people the truth that happiness is not about money.

In Bashkiria in the village Shaymuratova system was introduced "free money" Gesell, which allows to make agricultural enterprise in a small village out of bankruptcy in the prosperous. Dramatically improve the social and psychological environment, increase productivity by 20%

In addition, introducing another system of "Compass" V.G.Vodyanova guys additionally increased productivity by 3-4 times.

(function (w, doc) { if (!w.__utlWdgt) { w.__utlWdgt = true; var

Continue reading Social and economic experiments in Shaymuratova

The first telecommunication 100G-Russian equipment T8 introduced in the IT operator

T8 company that has developed a transponder capable of transmitting data at speeds of 100Gb on a single-span lines at a distance of almost 500 km. completed the installation of the device on the network Inoventica in CFD and PFD.

The customer is the company Inoventica Vitaly slug by experts T8 install a new 100Gb DWDM-system "Volga", which includes a new transponder and, on the lines of the central (CFD) and the Volga District (PFD). The total length of high-speed fiber-optic lines in Vladimir, Nizhny Novgorod regions and republics of Tatarstan, Bashkortostan and Chuvashia was 1.5 thousand

Continue reading The first telecommunication 100G-Russian equipment T8 introduced in the IT operator

Plant growing seedlings for reforestation in the Vologda region

In 2010, in the Vologda region began construction of the complex processing of raw forest seed and planting stock with closed root system. June 30, 2011 was commissioned a modern plant for growing seedlings with closed root system.

Construction of the plant for growing seedlings was one of the areas of priority investment project in forest development, implemented by PG IN "Vologda Forestry Association."

The purpose of the complex — provision of planting material with closed root system with improved hereditary properties of the state order in the reproduction of forests and forest users — the tenants of forest plots.

Continue reading Plant growing seedlings for reforestation in the Vologda region

Creates a new chassis KrAZ ZERNOVOZNOGO EQUIPMENT FOR THE INSTALLATION

"KrAZ" manufacturer new car chassis KrAZ-6511 (6×4) continued the development of a promising line of vehicles with mounting as "cab-over-engine."

This car chassis specialists adapted licensed cab MAN F-2000. She has good ergonomics of the driver: a comfortable seat with air suspension, adjustable in height and angle steering column, functional instrument panel provides the driver with maximum comfort while working.

Besides the KrAZ-6511 is equipped with a 6 — cylinder in-line diesel engine Weichai Power environmental class Euro 4, with the potential to support the Euro-5. 400-horsepower engine has a capacity of 11.596 liters and

Continue reading Creates a new chassis KrAZ ZERNOVOZNOGO EQUIPMENT FOR THE INSTALLATION

In KGNTS create a system that normalizes the level of the magnetic field on the

Courts

The experts of the physical fields of marine facilities and ocean Federal State Unitary Enterprise "State Scientific Center Krylovskiy" completed the second phase of development work "Noise", made under the Federal Program "Development of civil marine engineering." This phase included the development of technical projects of typical designs of offset low-frequency electromagnetic fields and the normalization constant magnetic field in the areas of ships and offshore facilities to normalized maximum permissible levels specified sanitary rules and regulations.

In Krylovskaya SSC create a system that normalizes the level of the magnetic field on ships

 The most intense

Continue reading In KGNTS create a system that normalizes the level of the magnetic field on the

SQL - 6 | 3,342 сек. | 8.53 МБ