Calendar

Август 2018
MTWTFSS
« Dec  
 12345
6789101112
13141516171819
20212223242526
2728293031 

New Volzhanin SITIRITM

In 2006, a group of companies "Volgabas" introduced the first fully low-floor bus series "SITIRITM." The appearance of this machine has completely changed the market of passenger vehicles. "SITIRITM" has set new standards in design, ergonomics, comfort, safety and technical equipment.

For 6 years, was released more than 500 buses a length of 12 m and 15 machines operating in 14 regions of Russia earned the highest scores of passengers and operators. 4 times "SITIRITM" won the award "Best Domestic Bus of the Year".

In 2010, the year the designers Scientific Center «Volgabus» started the development of the next

Continue reading New Volzhanin SITIRITM

New details about Prometheus

VILLAGE Zarya, Moscow region, December 24. / ITAR-TASS /. Anti-aircraft missile system / AAMS / C-500 will be able to simultaneously hit 10 ballistic targets with nearly orbital velocity. This was announced by Chief of the Russian Air Force, Lieutenant-General Viktor Bondar.

He recalled that at the C-500 is assigned a number of completely new solution for this class of weapons of tasks primarily related to ensuring the defeat of both existing and future air and space attacks, including in near space.

"S-500 will provide cover specific regions, cities, industrial facilities and priority strategic objectives. System will be

Continue reading New details about Prometheus

On the New Ryazan TPP commissioned a new plant heating system water

Dec. 21, at the Novo-Ryazan TPP solemn meeting devoted to the Day of Energy. Professional holiday gathering congratulated the authorities of the city and the region. They noted the innovative nature of the company’s development, and the most important social event of the year called the commissioning of a new installation of heating system water to the city of Ryazan. Working with the start of the installation of automated control system was made at the beginning of the heating season and became another important step in the implementation of the modernization program capacity.

On a new installation of

Continue reading On the New Ryazan TPP commissioned a new plant heating system water

We continue to build beautiful bridges. 25th km of Adler

Builders of the cable-stayed bridge, located at the 25th kilometer of combined railway and road Adler — skiing resort "Alpika Service", completed the installation of the guys — the main carrier of the central bridge span length of 312 meters. Collected and secured 28 pairs of guys total length of almost 5900 meters.

— Selection of the manufacturer of the cabling system was made very carefully. Taken into account when choosing a performance, installation and cost characteristics. The result was selected cable system with parallel strands. In this case, set at the beginning of the

Continue reading We continue to build beautiful bridges. 25th km of Adler

iPhone and the car are one

Taken from iPhones.ru. The author, the original Roman Yuriev (C).

The modern car is quite high class — this is not just a means of transportation, but a real gadget and computer, to say the least — a network of computers. This is all the gadgets gadget with which you can interact, either directly or remotely. What makes him do Pandora DXL 5000 in conjunction with the iPhone — just boggles the mind … or understandable. Let’s try to figure out together. Let me just say one thing — I, like an untrained person, the possibility of this anti-theft system

Continue reading iPhone and the car are one

The installation of the simulator SUPERJET 100 in Ulyanovsk Aviation flight school

Fire fighting crew simulator assembly of Sukhoi Superjet 100 completed training center in Ulyanovsk Higher Civil Aviation School (UVAU GA), the report said JSC "CSTS" Dynamics " (Moscow reg., Zhukovsky)

The simulator is designed for teaching and training of crews SSJ-100 piloting, navigation and operation of on-board systems and equipment, as well as actions in the presence of failures, malfunctions, and special occasions in flight, in accordance with the guidance on airworthiness of aircraft. Under the terms of the contract simulator is made in accordance with the requirements for flight simulation training device level VII qualification ICAO 9625 from 2009

Continue reading The installation of the simulator SUPERJET 100 in Ulyanovsk Aviation flight school

98th Guards Airborne Division first went to an automated control system Andromeda

First in the Airborne Troops moved to an automated control system division, which will ensure the safety of the Sochi Olympics

Today, on the basis of the 98th Guards Airborne Division at the site under the Ivanovo starts a command post exercise using an automated control system (ACS) "Andromeda-D." The peculiarity of these maneuvers is that real-time troops will be managed not only in the area, but also from control centers located hundreds of miles away from where they are stationed.

It is understood that this will be "fixed control points in the Russian Armed Forces General

Continue reading 98th Guards Airborne Division first went to an automated control system Andromeda

The plant PELLA launched the lead ship of integrated port services

21.12.2012, the Implemented Launching the lead ship of integrated port services on the basis of BSA-1000, etc., transmission of which the contracting authority will be implemented in 2013.

For the first time in the practice of the plant in the existing boat slip She was launched in length approx. 50 meters thanks to the specialists of the company developed a unique transport-trigger device using the "sliding" linkage approach to launching trolley for the ascent of the ship.

Purpose:

Bunkering of fuels Collection of oily water, wastewater, bilge water from vessels and floating objects Collection from ships of solid waste

Continue reading The plant PELLA launched the lead ship of integrated port services

At the Kuznetsk Ferroalloy Plant launched a new ventilation system

At the Kuznetsk Ferroalloy Plant launched a new ventilation system. Investment in the project amounted to 147 million rubles.

Slender number of new exhaust systems is noticeable immediately. This technology is unique to the industry Novokuznetsk. Dust is not visible even in the processing plant of ferrosilicon, its capture still in crushing the material and re-sent to production.

Sergei Sorokin, head of production processing ferrosilicon, "Everything is controlled by sensors, if somewhere something went wrong, the system shuts down, crushing stops. Without aspiration in this shop it will not work. "

Sergei Stroyev, chief operating gas cleaning installations "Kuznetsk

Continue reading At the Kuznetsk Ferroalloy Plant launched a new ventilation system

Holding Aviation presented 20 innovations

Holding "Aviation" has completed testing of innovative landing gear, emergency oxygen systems and components for fuel, hydraulic and air systems that can be installed on the promising Russian planes, helicopters Ka-62, Mi-38 and other machinery.

In the framework of the federal target program "Development of Russian civil aviation for 2002 — 2010 and for the period up to 2015" holding "Aviation", which is part of "Russian Technologies", completed the testing of 20 innovative designs. "I can say with confidence that the characteristics of these developments fully comply with international peers — that’s why we are planning to collaborate

Continue reading Holding Aviation presented 20 innovations

SQL - 6 | 1,152 сек. | 8.57 МБ