For the first time in Russia carried out with the use of prostate brachytherapy

domestic microsources

Needle implantation microsources

Two brachytherapy for prostate cancer with the use of Russian microsources produced by "Bebig" (subsidiary of JSC "NanoBrahiTek" created with the participation of RUSNANO) was conducted by specialists of the Moscow State Clinical Hospital № 50 under the supervision of a member of the Board of the Russian Society of Urology, k.m.n ., Professor Andrey V. Zaitsev at the department, headed by chief urologist Ministry of Health of the Russian Federation Dmitry Pushkar.  

Prostate Cancer — one of the most common cancers in men. One of the most promising and effective

Continue reading For the first time in Russia carried out with the use of prostate brachytherapy

Russia’s new anti-TB drug Perhlozon

registered

This was on March 21 in St. Petersburg, told the chief thoracic surgeon and phthisiatrician Russian, MD, director of the St. Petersburg Institute of Phthisiopulmonology Peter Jablonski.

Jablonski said that the drug was the fourth phase of clinical trials and proved to be highly effective in the treatment of drug-resistant tuberculosis, including those forms which are shirokoustoychivymi. According to Jablonski, the new drug has shown efficacy in the treatment of multidrug-resistant tuberculosis, that is, when the 3-4 well-known drug fail. "When testing a new drug has been integrated into the known therapies and treatment outcomes have

Continue reading Russia’s new anti-TB drug Perhlozon

Northern Wastewater Treatment Plant Vladivostok ready to work at full capacity

Northern Wastewater Treatment Plant in Vladivostok for the third month running in test mode. Now they received 12,000 cubic meters of wastewater per day. This is the first treatment in Russia, launched in beta in the winter. At full strength, they will begin to work closer to the summer. At night the northern wastewater treatment plant will be able to pass 50,000 cubic meters of waste water.

Photo: Anton Balashov, RIA PrimaMedia

The total capacity of all treatment Vladivostok: the northern, central and southern — is 370 thousand cubic meters of waste water per day when applying to

Continue reading Northern Wastewater Treatment Plant Vladivostok ready to work at full capacity

It abruptly white metal! On CHEMK opened smelter, which is no longer smokes

On Chelyabinsk Electric Factory was state acceptance of a unique complex gas treatment by which the smelter is no longer emits harmful substances. As the correspondent «URA.Ru», for the first time on a large industrial enterprise of the pipes is virtually alone air.

Similar equipment used in factories in South Africa, the USA and Germany. The new facility consists of five gas treatment units, each of which includes a separate set of equipment — cyclones, coolers, fans, exhaust fans. In total, they found 7.2 thousand tissue 10-foot hose from a unique membrane fabric made of polytetrafluoroethylene (Teflon-like).

Continue reading It abruptly white metal! On CHEMK opened smelter, which is no longer smokes

In Technopark of Novosibirsk Akademgorodok opened shop heat treatment

In Akademgorodok opened a new area of technological support of the Center industrial park — heat treatment shop. The shop opened Enterprise "thermometer".

To support the full development cycle of an innovative product (from design to production) device company resident Academpark, need quick access to the design office, 3D prototyping, machining, laser, waterjet cutting, etc. Heat treatment was one of the missing links of the cycle.

In a short time, "thermometer" will be ready to perform services for hardening, annealing, tempering and nitriding materials. The main target market of the company — the production

Continue reading In Technopark of Novosibirsk Akademgorodok opened shop heat treatment

Pskov Nephrology Center started

January 24 outpatient dialysis center in Pskov began accepting its first patients. To date, running a dialysis room. In February, the second will open, which will be treated patients with viral hepatitis. Center — a successful outcome of the public-private partnership. The investment agreement between the Administration of the Pskov region and the German company "B.Braun Avitum Russland" was signed a year ago. There are plans to open a branch in Pskov on 10 seats.

The appearance of the Centre — is a huge step in improving the security of the population of the Pskov region of

Continue reading Pskov Nephrology Center started

Krasnodar water utility has commissioned new equipment

treatment plant 17.01.2013

Last month, at treatment facilities number 2 plant sewage treatment facilities, LLC "Krasnodar Vodokanal" (part of the group of companies "ROSVODOKANAL") was established automated system for controlling the supply of air to the aeration system ("OXY-SMART), which allows high precision to maintain optimal oxygen concentration in each aerotenke.Takim, the commissioning of the system will enable the company to increase the efficiency of wastewater entering, maintaining the specified parameters cleaning as well as reduce the cost of electricity.

Due to the fact that the flow of sewage during the day is inconstant, depending on the quantity

Continue reading Krasnodar water utility has commissioned new equipment

In St. Petersburg, opened the reconstructed Children’s Orthopedic Center of Institute Turner

December 28 opening ceremony of the reconstructed building of children’s orthopedic trauma training and treatment center FGBU "Nido them. GI Turner ".

 

The opening of the center — the most important event not only for the city but for the whole country. After treatment in Nido them. GI Turner travel from all over Russia. Now the kids and their parents can obtain prompt quality medical care, counseling or preventive procedures in the heart of St. Petersburg. Every day, the center will take 200-220 children.

Equipping of the center of medical

Continue reading In St. Petersburg, opened the reconstructed Children’s Orthopedic Center of Institute Turner

In Makhachkala (Dagestan) commissioned the largest in the North Caucasus, water treatment plants

In Makhachkala, was opened Tarnairskih water treatment facilities that will ensure an uninterrupted supply of quality drinking water. Water treatment plants began to build in the early 90’s, but due to lack of funding had to suspend three times.

The resumption of construction was begun two years ago by the federal and republic funds under the program "South of Russia". Construction of the project undertaken by enterprises of JSC "Arsi".

Tarnairskie sewage treatment capacity of 240,000 cubic meters of water a day will help ensure a consistent supply of Makhachkala, first of all residents of the village Samandar and

Continue reading In Makhachkala (Dagestan) commissioned the largest in the North Caucasus, water treatment plants

In Amber (Kaliningrad region). Commissioned bank protection structures

In Amber commissioned shore protection structures. This succeeded to save the village sewage treatment plant. Back in 2007, in the area of sewage treatment facilities Amber collapsed banks, which put at risk the continuing operation of the facility. The situation worsened after the 2011 storms.

In July 2011 it was decided to develop the design documentation for shore protection that would stop the erosion of the slope and to ensure the safety of treatment at Amber. When the project has been evaluated, the construction of a retaining wall included in the FTP. On the construction of the object allocated

Continue reading In Amber (Kaliningrad region). Commissioned bank protection structures

SQL - 16 | 1,332 сек. | 7.3 МБ