November 1 Akhtubinsky Shipyard launched the tanker project 52

Akhtubinsky Shipyard launched the tanker "river-sea" Project 52 (yard number 5202) for the company "Transpetrochart"

 

A total of Akhtubinsky Shipyard plans to build 4 tankers Project 52 for the company "Transpetrochart" until 2014. Just these tankers built Kostroma Shipyard. Total Company "Transpetrochart" plans preobresti 10 tankers to upgrade its fleet.

Characteristics of the tanker project 5Purpose of the vessel

Transportation of bulk crude oil and oil products of 0.7 — 1.1 t / m3 without restrictions for flash point, including requiring heating. In one flight carried a variety of cargo.

Area and conditions of use

  • Mediterranean, Black and Caspian seas in accordance with the class of the ship;
  • The inland waterways of the European part of Russia, with the passage of the Volga-Don and Volga-Baltic Waterway.

On the composition of radio — sea areas A1, A2, A3 by global maritime safety and distress (GMDSS).

Design temperatures

  • Outdoor — +30? C at a humidity of 60-65% in the summer to -23? C at a humidity of 85% in the winter;
  • seawater — from +32? C to 0? C.

Architectural and Structural Type

Tanker with the placement of cargo in cargo and slop tanks of the ship's hull, double bottom and double sides, with tank and aft superstructure, aft engine room and cabins, with two screws in the steering nozzles, with the wheelhouse from side to side.

The ship is based on the Russian River Register class +M-SP3, 5 A.

Key Features

Main dimensions

Overall length, m ……………………………………… 141.0 …………..
Width, m ……………………………………… 16.6 …………..
Overall width, m ……………………………………… 16.9 …………..
Depth amidships, m ……………………………………. 6.55 …………
Draft, m ……………………………………… 1.13 ……………..
Draft summer load line, no more than m ……………………………… 13.2
Air draft at draft 3.2 m, m ………………………………… 63.7 …
Gross tonnage ………………………………………… 4760 ……….

The vessel's fresh water
a density of 0.998 t / m3 at draft empty ………………………. about 2 280 t.

Displacement of the vessel in the sea water
density of 1.025 t / m3 at draft
summer load line ………………………………………. ……………… about 8 256t.
Cruising on fuel, fresh water and provisions — 8 days. The vessel has 10 cargo and two slop tanks, total capacity amounts to 7381 m3, including freight — 6920 m3. This volume allows the tanks to carry 4,902 tons of cargo — oil density of 0.7 t / m3.

Seaworthiness

The speed of the vessel is fully loaded with a draft of 3.6 m on an even keel, the wind force of up to three on the Beaufort scale and excitement of not more than two points, with a water depth of not less than 21.6 m, with freshly painted and clean hull, at 85 % of main engine power is about 10 knots.

Maneuverability is provided by two rotary nozzles. For maneuvering the vessel is equipped with bow thruster.

Fire protection

Fire-resistant design of A-60, which provided fire setting fire insulation type ROCKWOOL FIRE BATTS 130 or a floating floor panels of STACO-FF-50A.

Bookmark the lead ship Project 52 (yard number 5202) was held 19.10.11g. The descent took place


Like this post? Please share to your friends: