In Voronezh, opened a factory for the production of building structures

December 19 in Voronezh industrial park "Maslowski" the launch of the first phase of production and logistics complex holding "Armax Group" — a factory for production of walling — modern wall and roof insulation panels. They are used for pre-fabricated buildings for industrial, civil and residential applications, as well as protective screens, roads and railways.

Construction of production and logistics center in the industrial park is being supported by the Government of the Voronezh region since 2009. The project is included in the program of socio-economic development of the region in 2010-2014. The aim of the project is the creation of a large industrial complex for the production of modern building construction, insulation materials, life-support systems of buildings and structures, as well as prefabricated modular buildings for the construction industry in Russia.

The second stage will include a production of mineral wool on the basis of basalt and equipment for ventilation and air conditioning systems, their delivery is scheduled for May — June of the following year.

The total cost of the project — 3.5 billion rubles.

Like this post? Please share to your friends: