In Tatarstan, was opened after reconstruction bridge over. Sheshma on the road Leninogorsk-Cheremshan

The opening of the reconstructed bridge over the river on the road Sheshma Leninogorsk — Cheremshan between the villages of Old Ishteryak Bakirovo and the Republic of Tatarstan was held in late October.

A feature of this crossing is that all of its teams, the total mass of 210 tons, bonded together without a single weld. They are connected only by the bolts, which at times increased strength, load capacity, durability and safety erected structure.

Like this post? Please share to your friends: