Another batch of Chelyabinsk-12 bulldozer sent to Vietnam

Party machines of five bulldozers B-12 Chelyabinsk tractor-prepared for shipment to Vietnam. Delivery of this is part of a prisoner at the end of the last year of the contract for the shipment of ten tractors in the South Asian nation.

In the assembly hall, a pick-delivered 40-foot sea containers, which are packaged in a B-12. Machines previously disassembled into modules, re-paint, carefully prepared for further ways. Until the end of February, all the bulldozers will be shipped to the customer — the branch of "Wu-Trak" in Hanoi.

Sent by rail containers at the port of St. Petersburg loaded on a ship that will deliver equipment to a European port. There it was loaded on ocean-going ship. All the way from Chelyabinsk tractor will take about a month.

Previous 5 bulldozers were sent 21.12.2012

Like this post? Please share to your friends: