Finished steel erection top 3S-station cable car in Krasnaya Polyana

  • sochi-3634
  • sochi-3634


© roing.ru

For delivery of athletes and fans from the lower cable car station "Alpica service" to ski and biathlon complex "Laura" on the ridge Psekhako expertsOOO "Gazprom sotsinvest" built 3S-lift.

This road is longer than 5 km will be one of the longest runs of its kind in the world.

 

© roing.ru

Work on the installation of metal building on top of 3S-station cable car has been completed. At the moment, has been actively working on the device roof top station of the cable car 3S-held and installation of energy supply.

© gazprom.ru

The total mass of metal was 355 tons.

It also fully completed the installation of the main technological equipment 3S-cable car — carrying and hauling ropes, rolling stock, basic and emergency engine control complex cable car. Also, work continues on the engineering protection of the object.

Installation of all supports — five major and one of the on, the height of the supports is from 39 to 78.5 meters, was completed in the summer of 2012.

One of the five pillars of 3S-cable car.

© roing.ru

The route passenger cableway starts from the lower station unit 3S "Alpica Service" at around 550 meters, and ends near the building of the Hospice number 2 at around 1646 meters. 3S-cabin cable car designed to carry 30 people at a time, capacity — 3000 people per hour in each direction.

Design professionals involved in the cable carof "Rosengineering".

Sketch the top station 3S-cable car.

© roing.ru

In autumn 20133S-lift "Alpica-Service" — a ridge Psekhako will work.

 http://roing.ru/detailPro…ction=photos # projectLinks rn http://www.gazprom.ru/abo…s/2013/may/article162023/ 

Like this post? Please share to your friends: