International Center of passenger and cruise shipping is being built in Sochi.

In the second stage of the transformation of Sochi seaport in the passenger port, construction of two berths with a total length of over 700 meters with guards jetties, breakwaters and the protective breakwater, two berths with a total length of 380 meters, fleet berths and an office building and the building across the state border of the Russian Federation .

Builders completed a five-story reinforced concrete frame office building. Ongoing construction of metal structures for the two-story building across the state border of the Russian Federation.

 

General contractor: "Rosmorport"
Customer: Ltd. "Corporation INZHTRANSSTROY"
Designer: LLC "Marine construction and technology."

© rosteck.ru

The dominant feature of the new complex will be an office building. And building it over the border of the Russian Federation form a single complex of the Center for passenger and cruise shipping. It is planned that the passenger cruise ships for 2015 will amount to 108 thousand people., The passenger ferry and line of passenger ships — 106 thousand people.

International Passenger Terminal

Office building

Office building — Is a five-storey building, two buildings which are connected at right angles rounded of to where the offices and lift lobbies. On the first and second floor of the combined volume of projecting rounded lobby and conference room.

In the facades with a mix of glazed surfaces of walls and deaf. The building is faced with a ventilated facade system with aluminum panels. Stained-glass windows and aluminum window frames.

International Center of passenger and cruise shipping will be within the framework of preparations for the 2014 Winter Olympics in Sochi.

 http://www.greenway.ru/ne…ms/newscustoms_15488.html 

 http://www.morproekt.ru/ 

Like this post? Please share to your friends: