Novomoskovskaya power plant experienced a new recovery boiler

Waste heat boiler for power plant Novomoskovskovskoy made of "ZIO-Podolsk" (included in the Engineering Division of Rosatom — AtomEnergoMash), has successfully passed acceptance tests.

14-16 April 2013 at the station had conducted a comprehensive 72-hour sampling of the waste heat boiler P-142 in the new combined-cycle power generating capacity of 190 MW Novomoskovskaya SDPS ("Quadra" — "Central generation").

This is the first in Russia HRSG, designed with the latest technical solutions specialists SKB Boiler OJSC "IC" ZIOMAR "and custom" ZIO-Podolsk "under a license agreement between OJSC" Atomenergomash "and NEM Energy bv (Netherlands).

Representatives of JSC "Quadra" — "Central generation", JSC "Energokaskad", OJSC "IC" ZIOMAR "Oka and management RTN signed a document that confirms the adequacy of the design of the waste heat boiler, its components and documentation all the technical requirements of the project and the requirements of industrial safety and confirmed their willingness to industrial boiler operation.


Like this post? Please share to your friends: