Of AFS built offshore fixed platform to the Caspian Sea

Astrakhan Shipbuilding Production Association OJSC ("AFS") completed the construction of a fixed platform for the field "Zhdanov" on the Turkmen shelf of the Caspian Sea.

The customer is Dragon Oil Turkmenistan Ltd., Contractor LLC "KNRG Projects." The installation will take place in the sea, LLC "Crane Marine Contractor." The platform is designed for operation of wells drilled with a jack-up rig and drilling crew accommodation numbering 90 people during the drilling of wells and temporary accommodation 8 person staff in the operation period.

Fixed offshore platforms, "Zhdanov" consists of wellhead platforms and residential platforms, connected by a transitional bridge. The platform consists of basic blocks and the topsides to be deposited on them the appropriate equipment.

The main characteristics of wellhead platform in meters (length, width, height): a support base — 40 x 20 x 32,5, weight — 1350 tons topsides — 65 x 45 x 6.7, weight — 1350 tons. Main dimensions residential platform in meters (length, width, height): a support base — 20 x 20 x 32,5, weight 375 tons topsides — 35 x 25 x 6.7, weight 350 tons

Like this post? Please share to your friends: