Overview kindergartens, were not included in the news over the past week

In Astrakhan, after the cap. Repair opened a kindergarten for 320 places

5 September in the city of Astrakhan, in the district of shipyard named 3-International, was opened after reconstruction kindergarten number 44. Thus, all in this village was reduced to 320 preschoolers.

Built 40 years ago, kindergarten obsolete, in need of major repairs. What was done. The two-story modern building has become a second home for local children. Increase in the number of groups instead of the previous ten they became the object dvenadtsat.Snaruzhi stoned metal siding, inside is insulated floor, completely replaced the heating system, put in new windows, have put our two elevator units (this will ensure the normal temperature mode), replaced the roof. Near the building undeveloped green space, walking paths lined with paving tiles, installed playgrounds, shady canopies, sandboxes.

Photo

In Saratov, after the cap. Repair opened a kindergarten for 210 children

In October district opened after reconstruction kindergarten number 54. Work was carried out in the framework of the municipal long-term program to expand the network of preschool institutions in Saratov, 2011-2015.

At the rehabilitation measures have been allocated 29.8 million rubles. from the city budget, which allowed to warm facade, replace the heating system, water supply and sewage systems, windows and doors, plumbing fixtures in groups to carry out internal repairs of premises, purchase and install a new front porch and playgrounds, renovate and equip the territory, to repair the pool with the restoration of the floor heating and warm the floor in groups on the ground floor of the building. Thanks to the new annex building, built during the renovation, the kids have a great gym.
Furthermore, another group is organized in 20 locations. Now the kindergarten can attend 210 children.

Photo

 

In Elista after the conversion and renewal. Repair opened a kindergarten for 120 places

September 2 in Elista the grand opening of the branch kindergarten number 9 "Daisy".

Earlier this building housed the school, the building is now returned to pre-school education. During the renovation work was carried out by the replacement of window and door openings, a complete replacement of utilities (water, sewage, heating, electrical), replacement of linoleum, roofing, fencing, landscaping produced — set shady canopies, asphalt, small architectural forms.

Photo

In Sorsk (Khakassia) after the conversion and renewal. Repair opened a kindergarten for 90 seats

Former building of PU-12 in 2011, the State Committee on Property of the Republic passed the education department of the city administration. Today, after two years of reconstruction cost 28 million rubles. Five groups of kindergarten take more than 90 guys. Reinventing the building is equipped with a bright new furniture, environmentally friendly toys, teaching aids. Also for the kids equipped music room, all the conditions for sports and recreation activities, emotional, aesthetic and harmonious development of children.

Photo

In Pskov Pskov region after reconstruction opened a kindergarten for 65 seats

The preschool will take 65 young velikoluchan. In kindergarten will be three groups for children aged 1.5 to 3 years.

Reconstruction of the building, which houses the "Joy", performed as part of a long-term target program "Development of the system of pre-school education in Great Luke for 2010-2014" and financed from the regional and municipal budgets.

Photo

In Mezhdurechensk, Kemerovo region has opened a kindergarten for 40 seats and an additional group of 25 seats

In 2011, the city authorities decided to build in the village Mayzas complex "elementary school — kindergarten." September 2 was put into operation the first starting complex — a kindergarten. It is designed for 40 children aged 1.5 to 7 years. Each group of children has its own color scheme. Group filled with modern educational toys, furniture, original design. In establishing a new medical unit consisting of a medical office, insulator graft.
In the kindergarten are play areas with awnings and small forms. The total cost of the work is 56.5 million (including the kindergarten — 38.5 million rubles).

Link

Mezhdurechensk kindergarten "Fairy Godmother" has opened an additional group.

"Fairy Godmother" — a kindergarten combined type, there is another group opened for 25 children three years of age. At the opening of the group sent to 1.5 million rubles. With these funds, the group underwent a major renovation that meets modern requirements Sanitary and fire safety.

Link

In p. Bulls spur of the Saratov region on the basis of the school opened a kindergarten for 40 seats

1 September in the village Bulls spur Balakovsky District opened kindergarten "Rainbow", for 40 preschoolers. Pre-school located in the village school and is a structural unit. The reconstruction of the school building made by the budget Balakovo municipal district co-funded by JSC "Severstal" through public-private partnerships.

Photo

The station Tyagun Altai region after redevelopment and reconstruction has opened a kindergarten for 50 seats

Sept. 1 opening of a kindergarten "Lesovichok" at the station Tyagun Zarinsk district. The preschool will visit 50 children.

In 2012, as part of a long-term target program "Development of pre-school education in the Altai Territory" 2011-2015 Forestry former building was transferred under renovation to create it in preschool. Reconstruction of the building began in early 2013, at the time of the start of work on it there were only walls. Of all the sources of funding has been allocated more than 25 million rubles.

Photo

In Yekaterinburg, after the cap. Repair opened a kindergarten for 140 places

On Thursday, 5 September, opened the renovated kindergarten number 109 on the street Lodygina, 4 "a."

Work in the kindergarten began in August 2012. Builders in the course of overhaul put things in preschool perfect order: the replacement of ceilings, windows, floors perestelili, brought new furniture and equipment. After repairs in the renovated building of the kindergarten group appeared bright and spacious classrooms and a nap kids, modern medical and kitchen units. In addition, for the recovery of the kids in preschool has a sauna and swimming pool, which will operate in conjunction with the start of the heating season.

Photo

In p. Molkeevo (RT) after the cap. Repair opened kindergarten

Kindergarten building, erected in 1961, was not repaired after construction.

After the repair room for games, recreation, dining have changed beyond recognition in the home ready insulated floors carpets, working bathroom. The building was reconstructed in accordance with the sanitary requirements.

Photo

In Novomoskovskiy village. Filimonovsky after the cap. Repair opened a kindergarten for 30 seats

The building in the Novomoskovsk administrative district that were left abandoned for 17 years, was repaired in just six months and returned to the kindergarten. The walls are plastered and painted in pastel colors, all rooms are equipped with new furniture.

Previously, the building was located only two groups, but now, in addition to facilities for the older and younger groups, there appeared an assembly hall, and on the street will soon be completed playground. The newly open one kindergarten is designed for 30 pupils.

Link

In p. Yermolovka Voronezh region after the conversion and renovation of a kindergarten for 25 seats

    The building in the Novomoskovsk administrative district that were left abandoned for 17 years, was repaired in just six months and returned to the kindergarten. The walls are plastered and painted in pastel colors, all rooms are equipped with new furniture.

    Previously, the building was located only two groups, but now, in addition to facilities for the older and younger groups, there appeared an assembly hall, and on the street will soon be completed playground. The newly open one kindergarten is designed for 30 pupils.

    Link

    In p. Yermolovka Voronezh region after the conversion and renovation of a kindergarten for 25 seats

    September 2, 2013 in the village of Yermolovka Pochepsky rural settlement solemnly opened the doors for young pupils of kindergarten.

    Garden is located in a former doctor's apartment, which is located in the building of the FAP. Since this apartment for a long time has been unclaimed, it decided to give a preschool. For the reconstruction of the building took about 4 million.

    Photo

    In Novomoskovsk, Tula region after the conversion and renewal. Repair opened a kindergarten for 110 places

    The building it was built in 1968, in 1991 it was closed for repair, and it did not work for a long time. In the 2000s. indoor preschool located Interscholastic training complex. When, in 2011, it became clear that the places for pre-school children is not enough, it was decided to resume the work of the kindergarten.

    Repairs and equipment from different levels of the budget was allocated a total of more than 29 million rubles.

    Photo

    In Irkutsk, opened a private kindergarten for 75 children

    This is the third children's complex, opened in Irkutsk, financial and construction company "New City". Elegant corridors, cozy spalenke, playgroups September 5 day stay was 75 kids of all ages.

    Photo

    In Dobryanka Perm region after reconstruction opened a kindergarten for 117 places

    Kindergarten for 117 kids came on September 4 Dobryanka (Perm region). Specifically for him remodeled building in the heart of the city. Funds for repairs and new equipment identified regional and local budgets. The new garden will be 7 groups of 117 babies: 2 groups of toddlers, 4 groups of kindergarten and the only one in the group by correctional work with children with disabilities.

    Link

    In Neftekumsk Stavropol region after the cap. Repair opened a kindergarten for 320 places

    In the 1990s, when the birth rate fell sharply, kindergarten "Daisy" was closed, set in a social services. Now, with a shortage of places in kindergartens, local authorities decided to use the building for its intended purpose. Calculated municipal state-owned pre-school educational institution with 200 seats.

    Link

    In Salekhard on the basis of the Yamal versatile college opened a kindergarten for 44

    On the Yamal Peninsula in Salekhard open preschool "corporate" group on the basis of state educational institutions of secondary vocational education Yamal-Nenets Autonomous Okrug "Yamal versatile college." Her pupils were 44 children from 2 to 5 years old, whose parents are staff members and students of the college and above the regional education system.

    To ensure the activities of the group Yamal versatile college provided municipality Salekhard room.

    Photo

    In the Ryazan kindergarten opened an additional group of 20 seats

    Recently, in the framework of the program "Development of pre-school education in the city of Ryazan on 2012 — 2014 years" in kindergarten number 119 ended the reconstruction process, which resulted in the third-floor superstructure is made. There was placed a sports hall, formerly located on the first floor. And in its former premises spent repairing and created a new group with a flourishing name "Daisy".

    Photo

    In Yelets Lipetsk region after the conversion and renewal. Repair opened a kindergarten for 110 places

    On the 60th anniversary of the Lipetsk region in Yelets opened a new kindergarten number 3 with 110 seats. He "settled" in the case of the former children's home, was disbanded at the end of last year.

    Link

    In Vladivostok, after conversion and renewal. Repair opened a kindergarten for 120 places

    September 3, in Vladivostok on the street Gulbinovicha, 4 went "swimming in" kindergarten "Boat".

    Suspended ceilings in the rooms, the floors warm in groups on the walls — art paintings. In groups — children's furniture, colorful toys, in playgrounds and even a vegetable garden. Farmland — a special feature of the new garden. Children will feel like a real agronomists, planting carrots, cabbage and other vegetables.

    Photo

    In Petrov Val, Volgograd and the village. Mountain Volgograd region after the cap. Repair opened kindergartens

    With the new school year for 165 kids from Volgograd opened additional seats in the kindergarten "Alenka" at school № 116 of the Soviet district and elementary school-kindergarten number 10 of the Kirov region. Kindergarten building has been completely refurbished and equipped at the expense of regional and municipal funds.

    Repairs to the school-kindergarten number 10 is completed — for this purpose spent 26 million from the regional and municipal budgets. For 125 kids all conditions — fitted bedrooms, game, easting, outdoor landscaped area.

    Photo

    "KOLOSOK" garden in GP Petrov Val, which brought 126 children, was built 30 years ago and, until recently, in dire need of repair. The contract amount for pre-school institution was more than 6.7 million rubles.

    Another million rubles from the regional budget is aimed at the acquisition of new furniture for a specific kindergarten and technical equipment for the catering department. And the expected arrival of regional funds (about 200,000) which will be used to purchase toys.

    Link

    40 more places for children appeared in Gorny Soviet district of Volgograd. The regional government has helped return the building to the municipality, and spend the repairs. The allocated 8,000,000 rubles were restored network engineering, facade, replaced windows, landscaped neighborhood and the purchase of equipment for gaming, sleeping rooms and catering department. Along with the renovation of the kindergarten, a village school and got the bus to transport children.

    Link

    In p. Russian Aktas (RT) after the cap. Repair opened a kindergarten for 150 places

    Kindergarten was built in 1989 and has long been in need of repair. For these purposes, the company "Tatneft" has contributed more than 8 million rubles. Fully in kindergarten replaced windows, roof, heating system, electricity, water supply, refurbished entrances.

    Photo

    In the urban village Lower Maktama (RT) after the cap. Repair otkryls yadetsky garden with 130 seats

    Repair work began in May. Contractor — LLC "Stroykomplektatsiya." Fully windows were replaced, repaired a pitched roof, facade, laundry room, replaced the heating system, interior doors, ventilation system. Built entrance lobby on the program "Accessible Environment", purchased manufacturing equipment for catering department. For these purposes, the company "Tatneft" has contributed more than 12 million rubles.

    Photo

    In the Tula kindergarten opened an additional group of 28 seats

    September 2 in kindergarten number 146 on the street Kaul, 11, Bldg. 4 opening of additional groups. Repair work on the premises of pre-school institutions were under the municipal long-term target program "Development of Early Childhood Education in Tula." For repairs, purchase of toys, furniture and crockery was spent about 1, 5 million rubles.

    Photo

    In Ulyanovsk kindergarten opened an additional group of 25 seats

    229 In the garden, which is located on the boulevard of Lviv, this Monday 25 children from nearby houses got their start in kindergarten.

    Link

    In Ulan-Ude opened a school-based pre-school group with 54 seats


      229 In the garden, which is located on the boulevard of Lviv, this Monday 25 children from nearby houses got their start in kindergarten.

      Link

      In Ulan-Ude opened a school-based pre-school group with 54 seats

      Sept. 5 at school number 57 microns Energetic opened two pre-school group for 54 children from five to seven years.

      Groups are cozy bedrooms, two classes with new furniture, conference hall, a separate medical room with an insulator. Opening of the groups funded by $ 2.7 million.

      Link

      In Ulan-Ude after the cap. Repair opened a kindergarten for 180 places

      September 6, a kindergarten number 51 combined type "Red Riding Hood" with 180 seats.

      This institution opened its doors after five years of renovation. Now it is a bright and airy building with high ceilings, where the water supply is completely replaced, ventilation, sanitation, and energy supply. Put new windows and doors. Made cosmetic repairs. But the main thing was the construction of a new annexe which houses the catering department with new equipment and a variety of special workshops for the various processing products.

      Kindergarten is now equipped with all the necessary equipment: own baking oven, washing machine and dryer, modern electronic piano and fitness equipment. There's even a lift and a ramp for the disabled children. The neighborhood includes a playground, vegetable garden, flower garden, and eight playgrounds on the number of pre-school groups. The total amount of money spent — more than 116 million rubles.

      Link

      In the village of Khakassia Askiz opened a private kindergarten for 40 people

      Two groups, each of 20 preschool children, housed in a large two-story cottage. For leisure, there are kids here — bedroom and game room, separate dining room, well-maintained bathroom, a special room for visiting specialists (speech therapist, psychologist, teacher of a foreign language), the sea of toys and a large area for walking. To date, the kindergarten has written twenty preschoolers.

      Link

      In kindergarten n Lime EAO group opened with 26 beds

      The grand opening of the new group was held on September 4 at the kindergarten Limestone Township.

      The discovery was made possible by a group fundraising district budget and the regional program "State support for pre-school education in the Jewish Autonomous Region."

      Photo

      In Rasskazovo Tambov region after the conversion and renewal. Repair opened a kindergarten for 250 places

      The building of the kindergarten "Rainbow" was built in 1986. When preschoolers in the city was noticeably less in it instead of the kindergarten is located Rasskazovo Education Committee. But just over a year ago, it was decided to return the kids a building. Was renovated, modern facilities designed for preschoolers.

      As a result, there were 12 beautiful rooms where groups are located preschoolers, music and gymnastic facilities, medical office with the procedural and insulator, sensory room, offices psychologist and a speech therapist, easting, laundry room and other rooms. Repair "Rainbow" was sent to about 97 million rubles from the regional budget. In addition, the purchase of modern equipment was received 2,000,000 rubles from the federal budget as part of a comprehensive modernization program of pre-school education in the Russian Federation.

      Link

      In Kyzyl branch opened a kindergarten for 30 seats

      In kindergarten, "Fairy Tale" opened a branch, "Pinocchio" in a former children's club. After the completion of the primary school number 8 City Hall, it was decided to transfer part of the clubs in the school.

      Photo

      In suburban Lyubertsy opened a private kindergarten for 50 people

      August 30 in anticipation of the school year in Lyubertsy opened a new kindergarten "Swallow" for 50 seats and created by the original program of public-private cooperation.

      Photo

      In Novokuznetsk, Kemerovo region after the cap. Repair opened three kindergartens with 300 seats

      September 4 in Novokuznetsk after reconstruction okrylis three kindergartens for 70, 75 and 150 seats. if necessary, they can accommodate up to 400 children.

      All three pre-schools to the highest standards. But each has its own peculiarity. One will be a platform to study the safety rules in the other — orthopedic focus, and the third will bring artists, actors and musicians, and will pay particular attention to the arts.

      In their reconstruction has been spent 170 million rubles.

      Link

      In the suburban village of Bolshevik after the cap. Repair opened a kindergarten for 275 places

        September 4 in Novokuznetsk after reconstruction okrylis three kindergartens for 70, 75 and 150 seats. if necessary, they can accommodate up to 400 children.

        All three pre-schools to the highest standards. But each has its own peculiarity. One will be a platform to study the safety rules in the other — orthopedic focus, and the third will bring artists, actors and musicians, and will pay particular attention to the arts.

        In their reconstruction has been spent 170 million rubles.

        Link

        In the suburban village of Bolshevik after the cap. Repair opened a kindergarten for 275 places

        September 2, kindergarten "Gingerbread Man" in the village of Bolshevik Serpukhov District opened its doors to 275 children.

        Go to the main building was built, fully equipped and commissioned additional housing for 80 people. The old building has undergone a major overhaul. Now, "Kolobok" 13 teams, two of which — for children with developmental disorders of speech.

        Photo


Like this post? Please share to your friends: