http://keminfo.ru/image/news/view/7420.jpg
The city dump Novokuznetsk completed drilling three test wells to 8 meters for biogas production.
Each well will collect the gas in a radius of 15 meters. In the spring of the surface area of the pilot will be covered by an insulating layer of clay, and then begin installation of a pilot plant.
— This gas can be used as a substitute for natural gas, that is, to produce thermal energy for heating, for example, the neighboring industrial bases and enterprises. And his second direction — is to generate electricity, — Said the head of the department of man-made and recycled resources SibGIU Catherine Volynkina