At the head backup node Aushigerskaya power plant (Kabardino-Balkaria), construction of fish pass

In Kabardino-Balkaria branch RusHydro concrete work began on the construction of fish ladders at the head backup node Aushigerskaya power plant.

  • Concreting of the base wall of the upper chamber fish pass
  • Concreting of the base wall of the upper chamber fish pass

The main work will be performed at the site in 2013, and the start-up, in agreement with the Rosrybolovstvo, planned for June 2014.

Fish ladder designed by JSC "Institute Hydroproject" (included in the holding RusHydro), is designed to pass fish upstream hydroelectric spawning grounds and to secure a stingray fish and fry them back into the tailrace. The total path length fish ladder will reach 150 meters, and it will consist of 35 cameras. The bottom of each chamber is located 30 cm above the bottom of the previous one. The rate of flow of water will lower the barriers of walls and stones. It is assumed that water for the fish ladder will flow continuously to a specific flow rate.

Fish will come from the lower bay in the first (the lowest) camera. Then, rise against the flow to the second chamber and so on until the upstream side. In total, the fish have to climb 11 meters. The design has two spacious chambers rest, where the low rate of water flow will allow the fish to stop to gain strength.

"The project is designed fish pass on the experience of exploitation of previously entered similar structures that will allow us to create the most natural environment for the fish. This is the second fish ladder at the Cascade Nizhne-power plant: in 2010, we have provided fish passage on the head node Kashhatau HPP. These facilities will help fish migration and recovery of fish stocks Cherek River "- said the director of the Kabardino-Balkaria branch Kurman Otarov.

  • The head backup node Aushigerskaya power plant