Chirkeysk plant — the highest arch dam in Russia (photo)


 Photo source:bigpicture.ru

Chirkeysk hydropower? Ntsiya is located on the Sulak River in the Republic of Dagestan. It is the largest hydroelectric power station in the North Caucasus and the highest arch dam in Russia. It is built in a narrow gorge Chirkeisk deeper than 200 m, a width at the bottom of 12-15 m, on top of — 300 m Included in Sulak hydroelectric system. The installed capacity of hydropower — 1000 MW. The average annual production of 2.47 billion kWh


 Photo source:bigpicture.ru


 Photo source:bigpicture.ru


 Photo source:bigpicture.ru


 Photo source:bigpicture.ru


 Photo source:bigpicture.ru


 Photo source:bigpicture.ru


 Photo source:bigpicture.ru


 Photo source:bigpicture.ru


 Photo source:bigpicture.ru


 Photo source:bigpicture.ru


 Photo source:bigpicture.ru

Like this post? Please share to your friends: