Construction of Lower Bureyskaya HPP (report and lots of photos)

Author of the report — Vitaly Ragulin (LJ dervishv)

In accordance with the Project Bureyskiy single energy complex in the Amur region, several construction Lower Bureyskaya HPP.

 Lower-Bureisk power plant being built on the river tempest in the Amur region. The station is located downstream of the powerful Bureyskaya plant and performs a function of its contra-ie aligns uneven flow.
Lower electricity Bureyskaya plant will be equipped with such facilities as the second phase of the pipeline "Eastern Siberia — Pacific Ocean", Elga coal deposit, cosmodrome "East."
Lower-Bureisk power plant is designed as a medium-head hydroelectric river bed (HPP building is part of the waterfront). The project installed capacity of power plants — 320 MW, guaranteed winter capacity — 147 MW, average power output — 1,650,000,000 kWh

2. Administrative building construction Lower Bureyskaya HPP.

3. August 27, 2010 was the start of construction of the Lower Bureyskaya HPP.

4. Since that time, a large volume of work of the preparatory phase of construction — built roads, power lines, production facilities, housing for the construction workers. Backfilled pit of the main bridge construction, the general contractor is selected.

5. Substation, through which the building will be supplied with electricity, and in the future — be issued to the grid energy Lower Bureyskaya HPP.

6. The complex sorting of sand and gravel.
Divides it into fractions of different size, which are used to prepare concrete, and other tasks.

7. Mobile concrete plant.

8. Preparatory work for the construction of the Lower Bureyskaya plant began in 1980, but were soon stopped due to lack of funding. After the completion of the main works on the construction of Bureyskaya GES have the opportunity to come back to power plant construction kontrreguliruyuschey.
To date, the pit is drained, it started training bedrock under the concrete work on the construction of the power house and spillway of the dam.

9. The first hydroelectric power plant Bureyskaya Lower scheduled to be operational in 2014.

10. For builders and operators of hydroelectric power station in the village of Novobureysky built 60-room apartment house.

11. The apartment is in a new home for the corporate traveler to the construction professionals.

12. Construction trailers are gone.

13. June 27, Lower Bureiskaya plant visited by the Chairman of the Board of JSC "RusHydro" Yevgeny Dod.

14. Evgeny Dod congratulated the staff Bureyskaya hes a jubilee — the tenth year since the launch of the first hydraulic unit, and introduced the working staff of the new power plant director.
Following a workshop in Bureyskaya plant Evgeny Dod visited the construction site of Lower Bureyskaya HPP.
Right to left: Director Bureyskaya and Lower Bureyskaya GES Alexander Garkin and Chairman of the Board of "RusHydro" Yevgeny Dod.

15. We had a unique opportunity to look at the construction of the Lower Bureyskaya plant from a helicopter.

16. In a flood zone of Lower Bureyskaya plant gets a small (about 3%) of the territory of the state natural reserves "Zhelundinsky" and "Tract Irkun." Planned adjustment of the boundaries of reservations for the withdrawal of flooded lands of specially protected category. As compensatory measures to create the new reserve "Bureysky" which will unite in their composition preserves "Zhelundinsky" and "Tract Irkun" as well as additional areas of pine-fir forests and other land on the right bank of the reservoir Nizhnebureiskaya, which will increase the value of special protected land in the Amur region on 17,000 hectares. Planned activities for the transfer of the territory of the reserve from the flood zone protected plant and animal migration.

17. To the left of the road homes for builders and two hostels for shift workers with 200 seats to the right of administrative and management body, the base fuel storage and industrial buildings.

18. The commander of the Mi-8T.

19. The co-pilot.

20. Mechanic.

21. 500 kV lines for issuing the electricity Bureyskaya HPP.

22. From local learned that Russian electricity exports to China twice cheaper than paying for it Russian consumers. Why China’s electric power goes to 1 ruble 50 kopecks per kilowatt-hour, and the Russian regions, it costs about 3-4 rubles?

23. Construction of Lower Bureyskaya plant is one of the priorities of the investment program of JSC "RusHydro".
Many thanks to the press-service "RusHydro"For organizing an interesting blog tour.
Thanks to the crew "Avialesookhrana" for the opportunity to make good pictures from a helicopter!
Special thanks to Ivan Learn saiga20k Plum!

So it looked a year ago:http://russos.livejournal.com/1040945.html 