In Cheboksary school after the cap. Repair opened pool

March 6 at the high school number 45 after the overhaul was inaugurated schoolyard pool. More than seven years, the pool was empty — built in conjunction with the school in 1984, after many years of active ispolvaniya he became unfit for use.

The cost of reconstruction was 10 million 300 thousand rubles. Slabs have been replaced over the pool hall bathrooms, installed a new pitched roof, by increasing the height of the walls is much to raise the ceiling, the room was partially rescheduled, replaced on-site utilities — heating, electrical, ventilation, installed a new pump and filtration equipment. Here, new locker rooms for boys and girls with their showers, toilets. Naturally, the renovated building and acquired a new interior and exterior trim.

Photo

Like this post? Please share to your friends: