In Ryazan, completed construction of a new asphalt plant

The construction of a new asphalt plant at the Kuibyshev highway in the territory of "Ryazanavtodor." Completed commissioning Commissioning mixing plant capacity DS-168637 160t/chas. It is a modern plant, a natural gas with a microprocessor control system, which has baghouse to significantly reduce emissions.  

Installation provided automated and remote gravimetric dosing stone material and bitumen and filler. On the new asphalt plant is temperature monitoring and control of stone materials and flue gas at the outlet of the dryer drum. Temperature ready mix well regulated. Equipment factory is equipped with automatic or remote control of all the main mechanisms.

Managing the entire asphalt mixing plant is operated centrally from the control panel, which is located in the cab. Through the application of microprocessor control system provides the most optimal and economical mode of operation of the plant, as well as increased crop production, equipment reliability and quality of produced asphalt all brands.

Like this post? Please share to your friends: