In Section Michurinsky (Karachay-Cherkessia) school opened after reconstruction

In the village of Michurinsky Prikubansky District Karachay-Cherkessia republic after reconstruction opened a school for 380 students. 

Now in Karachay-Cherkessia is the construction of two new schools in Cherkessk and Karachaevsk and almost completed the construction of schools in the Ali-Berdukovskom and Lower Teberda. According to him, the Head of KCR, before the bodies of the executive power of the Republic, heads of local government task — to 2015 completely remove the issue with the emergency schools and that children do not learn in the second shift.

Construction work on the reconstruction of the disaster of the school building began in December 2011, after a visit here the Head of the Republic. It Rashid Temrezov decided to send to renovate the 28 million rubles, after he saw the deplorable condition of the school.

Repairs were carried out on an area of more than three thousand square meters (along with the technical basement — 487kv. M). Overhauled interior with replacement of internal engineering networks that provide water, electricity, heating, drainage work. The flat roof of the building was replaced with a hipped roof of corrugated board, installed new windows, doors, decorated facade, restored asphalt concrete yard area and directions to the school.

In the rural community Michurinskom no kindergarten, in this regard, the school offers a pre-school group of 20 children. The next year, plans to open another group of 20 people. The school has all the necessary conditions for a nursery school, where children will be taught from 3 to 6 years.

 

 

 

 

 

 

 

 

 

Like this post? Please share to your friends: