In the fourth block Beloyarsk first pumped sodium

On-site unit number 4 Kola NPP was put into operation a complex acceptance sodium, who arrived from France.

A special was produced by the heating of the oil system of the first container, making sodium, who was in transit in the solid state, transferred to a liquid state and pumped into storage tanks.

Total for the year for the unit number 4 will take 2,000 tons of sodium. The commissioning of the fourth unit of the BNPP in 2014, the estimated cost of its construction is about $ 1.2 billion.

Like this post? Please share to your friends: