In TSU (Tula) opened pool

New — the second — TSU pool was built in record time. Only a year has passed since the adoption of the 2011 decision on the participation of the university in the federal program "500 basins" and laying the foundation stone of a water-sports facility.

The new pool is equipped with the latest technology: use metal bath depth of 1.8 m, the newest system cleaning and heating of water in the basin of warm floors and benches. The length of each of the four paths 25 meters. Supported water temperature — 26.5 degrees Celsius.

In November 2012, the project "500 pools" open pool of Tula State Pedagogical University, LN Tolstoy. In 2014 it is planned to build another pool on the basis of Novomoskovsky branch of the Russian Institute of Chemical Technology Mendeleyev.

Lots of Photos

 

Like this post? Please share to your friends: