JSC SNSZ has signed a contract for the construction of six tugs

Of "Fair-Nevsky Shipyard" (part of the USC) has signed a contract with "P.TransKo" for the construction of six tugs Project 81. As the press service of the shipyard, delivery to the customer ships scheduled for April-May 2014.

Pusher Project 81 has a full displacement of 365 tons, length 25 m, width 10 m

The vessel is designed for pushing and short-term (emergency) towing barges Project 82 full displacement of about 5,200 tons at a speed of 10 knots. The ship is a unique on-board coupling type ARTICOUPLER KVC3545 company Taisei Engineering Consultant Inc. Thanks to the rudder propellers tugs have high maneuverability and simple and easy to manage.

As previously reported, Nizhny Novgorod plant "Red Sormovo" February 27, 2013 signed contracts for the construction of ten non-propelled dry cargo barges for the transportation of bulk cargoes. The construction is financed under a leasing scheme: barges customer is ZAO "Gazprombank Leasing" in the future will be transferred to barges, LLC "P.TransKo" for leasing. Tugs for these barges ordered to "Medium-Nevsky Shipyard".

Of "Fair-Nevsky Shipyard" offers customers a full cycle of works on the construction of ships and vessels of magnetic steel, aluminum and fiberglass, starting with working documents to delivery of the vessel. Manufacturing program includes ships and vessels for various purposes: missile boats (corvettes), anti-mine ships, patrol ships and passenger ships operating. The plant also offers a range of technical work on machining, gavanike, processing sheet poster, fiberglass and demagnetization.

Like this post? Please share to your friends: