JSC Uralkhimmash has delivered the body of the regenerator for JSC Gazprom Neft — Moscow Refinery

JSC "Uralkhimmash" shipped last block housing the regenerator for OAO "Gazprom Neft — Moscow oil refinery." The equipment is made to replace the existing installation of the regenerator G-43-107. The equipment was shipped to the customer for parts, motor transport. A total of 33 blocks were shipped.
Device weight is 190 tons, diameter of 11 meters, the height of 27.4 meters.

The equipment is made of carbon steel 09G2C. The device operates at a maximum temperature of 720 ° C and a maximum pressure of 2.05 MPa.
Position regenerator G-43-107 is intended for burning out coke from the surface of the pulverized zeolite catalyst in a fluidized bed.
Replacement housing regenerator at the customer will produce the company of "AYSS-1" (Omsk). Monitoring the performance of the assembly equipment will be carried out with the participation of a representative of "Uralkhimmash" at the installation site of the customer.
JSC "Uralkhimmash" has successful experience of cooperation with OAO "Gazprom oil": in 2011, 2012. was implemented large-scale project for the production of equipment for the oil refinery under construction in g.Panchevo (Serbia) company NIS. JSC "Uralkhimmash" within two years was supplied reactor, tank and column equipment, and four spherical tank of 600 m3 in Serbia. Total weight of the equipment supplied was more than 1,100 tons. Addition of "Uralkhimmash" has successful experience in the supply of equipment for other major assets of OAO "Gazprom oil" — the Omsk refinery. For the enterprise of "Gazprom Neft-Omsk Refinery" was made two hydrotreating reactor, column equipment, five double units spherical tanks, separators, high-pressure gas-product mixture.
At present, the manufacturing workshops of "Uralkhimmash" made three more reactors for OAO "Gazprom Neft-Moscow Refinery."

Like this post? Please share to your friends: