KAMAZ started production of the mini-TES

Development of mini-TESis a joint project of JSC "KAMAZ" Kazan and engineering company in the field of small-scale power "Alfa Energy", which carried out the calculations, prepared a draft technical documentation, and also took part in the installation of the first experimental mini-TES. All technical documents will be handed over "KAMAZ", which will be able to use it in the development of the following projects.


 Photo source:nabchelny.ru

The first mini-TES KAMAZ designed to produce electricity and heat supply in one of the housings of the engine plant. It can generate electric power of 100 kW and 128 kW heat. TPP is designed on the basis of the electric plant with KAMAZ inexpensive and most unified models with serial transport gas engines.


 Photo source:nabchelny.ru

The heat generated by the engine and the exhaust gases during operation, is transferred to the consumer in the form of hot water heated to 80-90? C with two tubular heat exchangers installed. The design of the housing is equipped with a container, which summed up the gas pipes, water pipes heated disqualified. In the container are the thermoregulatory system, alarm and fire with a gas analyzer.


 Photo source:nabchelny.ru

Mini-power plants will be for the "KAMAZ" product diversification. They can be used for the needs of the various sectors in the country, because the small-sized stations are able to produce electricity and heat required for facilities that require an independent source of heat and electricity. Moreover, unlike similar diesel stations gas installation in operation less expensive.

Like this post? Please share to your friends: