Miatlinsky plant — The second (middle) stage of the cascade hydropower plants on the river Sulak Kizilyurtovsky district of Dagestan. About the bottom step of the cascade I wrote — it Chirjurtsky complex plant. Together with LJ user russos, gelio_nsk and 4044415 we went up the river Sulak to the station from which the water reservoir of Makhachkala.

1. First, the view opens up our eyes to the lower station construction — is the main power house, open distribution system and surge tank. Dam itself was hidden in the gorge. November sun is completely lost in the clouds and not warmed. There was the sound of water and a light buzz of ORU. Romance.

2. Engine room. In the power house has 2 Kaplan hydraulic capacity of 110 MW, operating at a design head of 46 meters. Miatlinsky plant serves as a powerful counter-regulator Chirkeisk power plant (the top step of the cascade), leveling uneven daily water consumption in the interests of agriculture, fisheries and municipal services, while avoiding idle discharges.

3. We get down to the hydraulic units.
A bit of history. In 1970 he started the preparatory work for the construction of hydroelectric power plants. In 1977, on the right bank there was a major landslide, resulting in the construction was stopped. In the short time had to perform a large-scale landslide of work to change the design decisions and change the scheme of hydropower. As a result, power house was moved by 1.5 km. Already in 1982, the dam was placed first cubic meter of concrete, and in 1985 he began assembly of the first unit.
By 1986, were put into operation two hydroelectric.

4. Inside the hydraulic dark.

5. Cab overhead crane machine room station.

6. All of us in the apartments are set traps. This vodouravnitelny tank can also be called a siphon, but it’s a little different sizes. The main objective of this design — avoid water hammer in the system of waterworks. Word

  • [Info]
  • [Info]

4044415:
"If you need to stop the station or some urgent dropping gates, the water will not cause harm, tunnels, gates, building hydroelectric power plants. It simply goes into the siphon. If necessary — will be released from it for a few seconds fountain (but this is out of the realm of fantasy rather). "

7. In one and a half kilometers away from us in the gorge is an arch dam. You can reach it only by swimming or wade through the mountain.

8. Choosing the second option — Road tunnel length of 600 meters, connecting the powerhouse to the dam.

9. Meet — concrete arch dam height of 86.5 meters. It’s like a 28-story building. Crest length — 179 meters (almost like two football fields). In the downstream of the water is very small, because at that time, the entire flow through the hydraulic units and idler (flood) spillway is closed.

10. The stark beauty.

11. In the cockpit of the gantry crane at the crest of the dam. It is worth noting that our gang of photographers jumped on the dam as good mountain goats. We crawled all that you can. Apparently fresh air for us to act as energy.

12. The view from one of the outer galleries of the dam.


Enlarge image

13. Center. On top of the standard rain water flowed out of the reservoir.


Enlarge image

14. We gradually got wet. And outside the window was not the month of May. But it was still to come …

15.

16. Reservoir Miatlinsky GES — 47 million cubic meters, which is not that much. Panorama shot with a gantry crane, which controls the gates of the diversion tunnel, conduit going to the building of hydropower through the rocks.


Enlarge image

17. And again t
he word

  • [Info]
  • [Info]

4044415:
"Water Sulak. It is turquoise and the greater its depth — the more it gives a blue-green color. For people who did not see it live, it seems dabbling with photoshop. Yet it is her real color. That color the water can be found on so many mountain rivers fed by glaciers. Turquoise water, gives a blue suspended particles of clay. That’s all the explanation. "

18. Then we went for a walk in the dam body.

19. Somewhere to go, folded, rose and fell.

20. One more point. Echo there is good …

21.

22. And looks like the beginning of the idle water. Gantry crane with only a few centimeters lifted multi-ton metal gate, and there was the 70-meter waterfall.

23. Water poured down from the heavens …

24. Lots of water. And without that cold November morning was filled with ice-cold vapor.

25. Cameras began to quickly get wet, but continued to work, but has refused to hold hands and technique to press the buttons. Had to work nose.

26. In order to have time to remove the spillway from several angles, we, the photographers rushed up and down the dam, and then slipping on treacherous ice.


Enlarge image

27. Not feeling the breath and the cold, we took off for the distillation of the crest of the dam. The view from the gantry crane.

28.

29. The camera angle changed rapidly.

30. After these forces runs completely gone. For completing the panorama had to get the helicopter.


Enlarge image

31. Further our path lay up the canyon to the station, beauty — Chirkeisk HPP. But more on that next time.

 

  • Previous Entry
  • Previous Entry

  • Liked
  • Liked

  • Share
  • Share

  • Track
  • Track

  • Flag
  • Flag

  • Next Entry
  • Next Entry

Miatlinsky HPP. Dagestan
Miatlinsky plant — the second (middle) stage of the cascade hydropower plants on the river Sulak Kizilyurtovsky district of Dagestan. About the bottom step of the cascade I wrote — it Chirjurtsky complex plant. Together with

  • [Info]
  • [Info]

russos,

  • [Info]
  • [Info]

gelio_nsk and

  • [Info]
  • [Info]

4044415 we went up the river Sulak to the station from which the
water reservoir of Makhachkala.

1. First, the view opens up our eyes to the lower station construction — is the main power house, open distribution system and surge tank. Dam itself was hidden in the gorge. November sun is completely lost in the clouds and not warmed. There was the sound of water and a light buzz of ORU. Romance.

2. Engine room. In the power house has 2 Kaplan hydraulic capacity of 110 MW, operating at a design head of 46 meters. Miatlinsky plant serves as a powerful counter-regulator Chirkeisk power plant (the top step of the cascade), leveling uneven daily water consumption in the interests of agriculture, fisheries and municipal services, while avoiding idle discharges.

3. We get down to the hydraulic units.
A bit of history. In 1970 he started the preparatory work for the construction of hydroelectric power plants. In 1977, on the right bank there was a major landslide, resulting in the construction was stopped. In the short time had to perform a large-scale landslide of work to change the design decisions and change the scheme of hydropower. As a result, power house was moved by 1.5 km. Already in 1982, the dam was placed first cubic meter of concrete, and in 1985 he began assembly of the first unit.
By 1986, were put into operation two hydroelectric.

4. Inside the hydraulic dark.

5. Cab overhead crane machine room station.

6. All of us in the apartments are set traps. This vodouravnitelny tank can also be called a siphon, but it’s a little different sizes. The main objective of this design — avoid water hammer in the system of waterworks. Word

  • [Info]
  • [Info]

4044415:
"If you need to stop the station or some urgent dropping gates, the water will not cause harm, tunnels, gates, building hydroelectric power plants. It simply goes into the siphon. If necessary — will be released from it for a few seconds fountain (but this is out of the realm of fantasy rather). "

7. In one and a half kilometers away from us in the gorge is an arch dam. You can reach it only by swimming or wade through the mountain.

8. Choosing the second option — Road tunnel length of 600 meters, connecting the powerhouse to the dam.

9. Meet — concrete arch dam height of 86.5 meters. It’s like a 28-story building. Crest length — 179 meters (almost like two football fields). In the downstream of the water is very small, because at that time, the entire flow through the hydraulic units and idler (flood) spillway is closed.

10. The stark beauty.

11. In the cockpit of the gantry crane at the crest of the dam. It is worth noting that our gang of photographers jumped on the dam as good mountain goats. We crawled all that you can. Apparently fresh air for us to act as energy.

12. The view from one of the outer galleries of the dam.


Enlarge image

13. Center. On top of the standard rain water flowed out of the reservoir.


Enlarge image

14. We gradually got wet. And outside the window was not the month of May. But it was still to come …

15.

16. Reservoir Miatlinsky GES — 47 million cubic meters, which is not that much. Panorama shot with a gantry crane, which controls the gates of the diversion tunnel, conduit going to the building of hydropower through the rocks.


Enlarge image

17. And again the word

  • [Info]
  • [Info]

4044415:
"Water Sulak. It is turquoise and the greater its depth — the more it gives a blue-green color. For people who did not see it live, it seems dabbling with photoshop. Yet it is her real color. That color the water can be found on so
many mountain rivers fed by glaciers. Turquoise water, gives a blue suspended particles of clay. That’s all the explanation. "

18. Then we went for a walk in the dam body.

19. Somewhere to go, folded, rose and fell.

20. One more point. Echo there is good …

21.

22. And looks like the beginning of the idle water. Gantry crane with only a few centimeters lifted multi-ton metal gate, and there was the 70-meter waterfall.

23. Water poured down from the heavens …

24. Lots of water. And without that cold November morning was filled with ice-cold vapor.

25. Cameras began to quickly get wet, but continued to work, but has refused to hold hands and technique to press the buttons. Had to work nose.

26. In order to have time to remove the spillway from several angles, we, the photographers rushed up and down the dam, and then slipping on treacherous ice.


Enlarge image

27. Not feeling the breath and the cold, we took off for the distillation of the crest of the dam. The view from the gantry crane.

28.

29. The camera angle changed rapidly.

30. After these forces runs completely gone. For completing the panorama had to get the helicopter.


Enlarge image

31. Further our path lay up the canyon to the station, beauty — Chirkeisk HPP. But more on that next time.

Reporting by Dmitry Chistoprudova with other GES:
The complex Chirjurtsky plant — Lower level Sulak cascade.
Ship lift Krasnoyarsk hydroelectric power station
Construction of hydropower Boguchan
Mainskaya plant
Zagorskaya
Sayano-Shushenskaya HPP. Part 2
Sayano-Shushenskaya HPP. Part 1

The author thanks the Dagestan branch of "RusHydro" for organizing this shooting!
Another post on the subject: Nature of Dagestan

Reporting by Dmitry friends:
Glory: http://gelio-nsk.livejournal.com/162079.html
José Yero: http://4044415.livejournal.com/91887.html
Sasha: http://russos.livejournal.com/897468.html

Like this post? Please share to your friends: