Muravlenkovskneft has commissioned a pipeline to transport APG

The branch of JSC "Gazprom Neft-NNG" — "Muravlenkovskneft" was introduced in the gas pipeline to transport APG (APG) with the North Yangtinskoye field.

Commissioning of the pipeline with a diameter of 219 mm and a length of 24.5 km has allowed to increase the load capacity of the plant is 25 million cubic meters of associated gas per year.

Construction of a gas pipeline from the North Yangtinskoye field was carried out in the framework of the November Integrated Project "Gazprom oil" to raise the level of utilization of associated gas. The project also included such fields as Vyngayakhinskoye, Ety-Pur, Vyngapurovskoye, Christmas, Yarainerskoe.

To run a program of recycling and improve the efficiency of utilization of associated gas "Gazprom oil" carries three major regional projects: the South Priobskoye on Vyngapurovskaya group of fields (November’s Integrated Project) and integrated project Tomsk (Tomsk Region field).

Bring the level of associated gas utilization to 95% of the South Priobskoye will allow the completion of the ongoing construction of the compressor station and associated gas gathering system. Utilization of gas under the November integrated project connected with the modernization of the system of collection and transportation of gas from the Ety-Pur field and expansion of processing capacity on the basis of Vyngapurovskaya gas compressor station, which performs works by SIBUR. The implementation of the Tomsk project involves the creation of an integrated regional system for the collection and transportation of gas as it may be processed in or near Tomsk Barabinsk.

Like this post? Please share to your friends: