New bridge in Aleksine (Tula region)


 Photo source:engtransstroy.com

The introduction of a new bridge over the Oka unloaded main thoroughfare of the city, linking it living quarters on the right bank with the industrial cluster, located on the left bank.


 Photo source:engtransstroy.com

The work was done around the clock, it allowed to build and put into operation a bridge exactly superrigidity schedule established by the builders — in just 9 months.
The new bridge — out-of-class, designed with the height of the existing spans for the passage of vessels. Width of 15 meters facilities, 12 of which — the roadway.
Will be renovated and the old bridge crossing.

Like this post? Please share to your friends: