OAO UES FGC completed the construction of 220 kV energy ring in Vladivostok

OAO "UES FGC" has commissioned a 220 kV transmission line Vladivostok CHPP-2 — Green Corner — The wave length of over 15 km.

With the introduction of a new line of work completed in the creation of an energy ring that united the main centers of power in Vladivostok: VTETS — 2, acting Vladivostok 500 kV, 220 kV Wave 220 kV Green corner.

This scheme has significantly enhanced network reliability of electricity supply in Vladivostok, providing the ability to connect the APEC summit to the grid of Primorsky Krai and unloading of 110 kV distribution network.

  • substation Zaleny Angle
  • substation Zaleny Angle

The project was realized in 2010-2012. under the investment program of OAO "UES FGC" routines "Development of Vladivostok as a center for international cooperation in the Asia-Pacific region" Federal Target Program "Economic and Social Development of the Far East and Transbaikalia until 2013".

As part of the project put into operation eight new backbone network facilities — Four 220 kV substation (Green corner, Patroclus, Russian, airport) at the total transformer capacity of 428 MVA and four lines in the air and cable performance over 150 km. In addition, the upgraded operating 220 kV substation Wave.

Total investments of JSC "FGC UES" in the construction of new facilities in Vladivostok amounted to about 10 billion rubles.

All the power units equipped with modern equipment, used the latest technology and a unique design.

Thus, part of the transmission line 220 kV green angle — Russian submarine cable is crossing over the Eastern Bosphorus Strait. By special request of JSC "FGC UES" was made three-phase cable with XLPE insulation single length of 2.2 km, which is laid on the sea bed.

At the 220 kV Green corner for the first time in the Far East instead of the traditional open distribution devices installed complete switchgear gas-insulated switchgear (GIS), 110 and 220 kV. This allowed up to five times to reduce the area of energy facility, which is especially important in a densely built city of Vladivostok. Switchgear more reliable and safe in operation, eliminates the impact on the environment.

 

At the same time in the south of Primorye JSC "FGC UES", this year will complete the construction of 500 kV energy ring Maritime power plant — Far East — Vladivostok — Lozovaja — Chuguevka — Maritime power plant and substation 500 kV Lozovaja.

 