On the construction of a bridge over the Amu Darya River in Turkmenistan mounted 6 spans

 

On the construction of a road bridge over the river Amu Darya in Turkmenistan mounted 6 spans. This was told by the director of the branch of "Road Construction" Altcom "Alexander Hamaydula.
"Assembled 6 of 14 spans. Each design weighs about 700 tons. Also shipped 4,000 linear feet of sheet piles for pereukrepitelnyh works. Work is underway on the construction of the final support, "- said Alexander Hamaydula.
Recall, the company is the general contractor for the construction of a road bridge over the river Amu Darya in Turkmenistan. The total length of the bridge with coastal fortifications will be 1415 meters, the road width — 11.5 meters.

Like this post? Please share to your friends: