On Uralelectromed (Sverdlovsk region). At the new site released the first batch of tellurium

In the new production site tellurium "Uralelectromed" released the first batch of products.
Upper Pyshma (Sverdlovsk region).

She underwent a thorough analysis in the laboratory of the Research Center of the enterprise. According to experts, the resulting tellurium on physical and chemical properties (impurities) meets the requirements of GOST. In the near future, the products will be shipped to customers.

Tellurium is widely used in electronics and semiconductor technology, the chemical industry and metallurgy.

According to the chief of production of selenium and tellurium chemical and metallurgical plant "Uralelectromed" Michael Koryakina, achieving high performance contributed to two main factors. First, the site is equipped with modern equipment with an automated control system that improves control over the entire process. Second, the staff has been trained shop, and his qualifications today can effectively serve the production line.

Preparation tellurium — a complex process that involves several steps, from copper electrolyte sulfation sludge reduction and finishing of the final product of alkaline solutions. On a plot involving modern reactors cleaning tellurium, pumps, filter presses imported and domestic equipment, used powerful ventilation system. The whole production line meets the requirements of occupational health and safety, and environmental legislation.

The new production site tellurium opened in April of this year.

Since its start-up volume produced by JSC "Uralelectromed" Te increases from 30 to 40 tons per year.

The cost of the project amounted to 105 million rubles.

Tellurium is widely used in electronics and semiconductor technology, the chemical industry and metallurgy.

Like this post? Please share to your friends: