Overview kindergartens, were not included in the news over the past week

In Yekaterinburg, after the cap. Repair opened six kindergartens.

 

January 31 opened a kindergarten number 89 on the street Shishimskoy, 16 (Vtorchermet).

Contractors went to the object in the middle of 2012 and in a short time completed all civil works: spent repairing roofs and facades, completed building facing work, replaced the internal and external communications and refurbish playgrounds. Now updated six teams will open their doors to 120 young preschoolers.

Photo + Video

 

January 31, opened a kindergarten in the street Mountaineers, 1 "a" at the Chemical Engineering.

Contractors went to the facility in June 2012 and in the same way as in the building of a kindergarten in the street Shishimskoy, completed on time all the civil works. The specialists have replaced the roof and facades, internal and external communications, arranged the tracks and driveways, replace the power supply network and communication, acquired modern equipment and furniture, and equipped with the new kindergarten toys and teaching aids. Preschool is designed for groups of 4, soon renovated building will take 80 children.

Photo + Video

 

Next:

 

February 1 opened kindergarten number 12 on Rosa Luxemburg Street, 46.

The preschool has been repaired in the shortest possible time. In the course of our professional redevelopment, replaced the roof, repaired the interior.

Updated kindergarten for up to 120 people, will be able to take the kids next week.

Photo

 

February 1 opened kindergarten number 230, entitled "The Sun" on Pioneer Street, 5a.

In the near future kindergarten able to take 120 kids.

Photo

 

February 1 opened kindergarten number 328 on the street Lenin, 67.

On the ground floor you will find a modern food processing unit, equipped with various home appliances to cook healthy and tasty food, and a laundry room, which includes two workshops: the ironing and laundry shop. On the second floor are equipped with a group of furniture and lots of toys.

DOW is designed for 110 seats.

Photo

 

February 1 opened a kindergarten in the street Illich, 50 b.

Capitally renovated, modern, spacious, cozy garden will be able to take 110 young children.

Photo

 

In Dobryanka Perm region after the conversion and renewal. Repair opened a kindergarten for 195 places.

Prior to 1999, this building has housed the kindergarten, then handed premises of cultural and business center of Perm GRES. In 2011 the building was transferred to municipal ownership and here decided to open a kindergarten.

On the restoration of pre-school institutions were sent about 49 million rubles from the regional and local budgets. At the federal money — 93.6 thousand rubles — purchased sports equipment and toys. A company "Lukoil" has helped renovate Music Hall and buy musical instruments.

Photo

 

In the village of Omsk region Krutinka after conversion and renewal. Repair opened kindergarten

Four primary and one preparatory group of children accommodated in the premises two-storey building, which was built 30 years ago directly into a kindergarten. But at that time the building as pre-school education was not claimed.

A year ago, it was decided to restore the building to its original purpose. True, it had to rebuild it almost from scratch, changing walls, partitions, windows and doors, as well as all the technical equipment. Made redevelopment of premises, upgrading heating, plumbing, ventilation, and many other activities. Returning kindergarten cost the regional treasury of 30 million rubles.

Photo

 

January 29 Prokopyevsk Kemerovo region after the cap. Repair opened kindergarten number 15 with 100 seats.

Kindergarten opened on the basis of the released of the building. There were overhauled, modern equipment in the nutrition unit, medical office, the economic bloc.
  
In the preschool will run the studio’s intellectual development "Umka", which is equipped with modern educational games Nikitin Voskobovich, Kyuizenera, Denesha. Here it is supposed to hold special sessions in the form of individual and subgroup. The peculiar developing environment can solve a wide range of educational goals for the development of fine motor skills, sensory abilities, intellectual abilities and the formation of universal educational activities at the pre-school pupils. In the future, on the basis of "Umki" is scheduled to open remote advisory point for families with children of preschool age.
  
Total for the reconstruction of the kindergarten was allocated 40 million rubles.

Link

January 30 Vyatskie Glades Kirov region after the conversion has opened a kindergarten "Tower".

Link


January 31 in the village of Yasnogorsky Kemerovo region has opened a kindergarten and his orchestra of folk instruments.

Five pre-school groups with 80 seats were opened on the basis of secondary schools in the renovated building of the former kindergarten "Forget-Me." This made it possible to eliminate the sequence in the villag
e for children aged two to seven years.
  

Particular direction — development of creative abilities of students. The kindergarten is organized orchestra of folk instruments, vocal and choreographic works studio.
  
Total for the construction and equipping of pre-school institutions of regional and local budgets were allocated 60.5 million rubles. In groups of kindergarten all the necessary conditions for the care of children. There is a cozy bedroom and a games room, a sports and music halls, modern catering department, medical room with special equipment for the treatment and prevention of colds. On the ground floor of the building, featuring heated floors, lockers in the reception room also heated.
  
On the territory of the rehabilitated area for walking with cozy porches, swings and slides. There is a playground, equipped with a treadmill, horizontal bars, football goals, basketball boards.
  
Kindergarten building meets all current safety standards — is installed automatic fire alarm system, special lighting and video surveillance for evacuation.

The new preschool created 30 jobs.

Link

The village Ilovatka Saratov region after the cap. Repair opened kindergarten "Birch".

Completion of the reconstruction was empty for more than 20 years, two-story building was made possible thanks to the financial participation of "Saratovneftegaz" vydelevshemu administration of the charity program of 1 million rubles.

So far, the pre-school education are located in adapted premises which do not meet the requirements of Russian legislation and Epidemiology. Successful completion of the construction work on schedule has made it possible to take daily in the new kindergarten more than half a baby.

Photo

In the villages and Kudutl Hvartikuni (Dagestan) opened kindergartens.

In the village of Kudutl opened a kindergarten for 35 seats. Work with children in preschools involved 17 people, most of whom are young professionals — graduates of the Dagestani universities.

In the village of Hvartikuni opened a kindergarten for one group, the villagers were at the opening of seven new jobs.

Link       Link      

 

February 1, Pushkin (St. Petersburg) has opened a kindergarten at the school with 100 seats.

February 1, Pushkin was a long awaited event: opened its doors for children kindergarten "Sun", pre-school department of secondary school number 407.

For the guys here are fitted with four cozy group and a small music room. The school is located in the territory of the new playground.

Photo

The village Agibalova Smolensk region opened a kindergarten at the school

In the village of Holme Agibalova Zhirkovskogo district opened a kindergarten "Fairy Tale" for up to 15 children.
Kindergarten opened in a single room in the village school.

Link

The village Vargashi Kurgan region opened a kindergarten at the school.

The village Vargashi opened a new kindergarten. 25 preschoolers found a spacious renovated space in the building of the primary school. Multi-age group will attend full-day children from 3 to 7 years.

Link

In the village of Great Chernigovka Samara region after the cap. Repair opened additional housing kindergarten.

    The village Vargashi opened a new kindergarten. 25 preschoolers found a spacious renovated space in the building of the primary school. Multi-age group will attend full-day children from 3 to 7 years.

    Link

    In the village of Great Chernigovka Samara region after the cap. Repair opened additional housing kindergarten.

    In the village of Great Chernigovka the opening of additional housing JV SEI school № 1 — Kindergarten "Firefly."

    The premises of three groups equipped with new furniture, educational games, allowances for training, in short, everything you need for a healthy lifestyle and healthy development of children.

    In particular, the equipment for visual support of educational activities and methodical work, namely, interactive whiteboards, laptops, multi-function printers, stereos.

    Link


    In the Moscow region opened three-Garden Building


    In Pavlovsky Posad opened Building a garden with 25 seats

    The establishment of this for many parents still unusual. But how it works is simple: the garden is located in a residential house, and kids remain under the supervision of educators, while mom and dad work — from 08:00 to 20:00.

    It is a private institution, so parents are paying more than the municipal kindergartens for 500 rubles a month. However, there are advantages: First, each of the 25 children are doing individually, and secondly, a garden, working on a program of public co-financing. This means that the parents of the money to be refunded. If a child attends the institution — then 20% if two children — 50%, three or more — 70%.

    Link


    In Ivanteevka opened Building the Garden

      The establishment of this for many parents still unusual. But how it works is simple: the garden is located in a residential house, and kids remain under the supervision of educators, while mom and dad work — from 08:00 to 20:00.

      It is a private institution, so parents are paying more than the municipal kindergartens for 500 rubles a month. However, there are advantages: First, each of the 25 children are doing individually, and secondly, a garden, working on a program of public co-financing. This means that the parents of the money to be refunded. If a child attends the institution — then 20% if two children — 50%, three or more — 70%.

      Link


      In Ivanteevka opened Building the Garden

      Kindergarten "Pochemuchki" — this is the first Ivanteevka Building Garden (garden on the ground floor of a residential building), created as part of a public-private partnership. It is designed for 20 children. As students take those who stand in line for providing a place in a kindergarten in the Committee on Education Administration Ivanteevka. Child’s stay in a kindergarten costs 27 000, 17 000 of them compensates parents state.

      Photo

       

      In Dolgoprudnom opened Building the Garden

      The new state educational private pre-school education — kindergarten "Together with my mother" — opened in Dolgoprudnom.Sadik capacity of 30 seats.

      Teachers and educators are new kindergarten "Together with my mother," an emphasis on musical and aesthetic education of children. But apart from making music and vocals, parents are offered exercise therapy, English classes and speech correction.

      The amount of payment for child support in a garden is the same as in the municipal — 2035 rubles.

      Link

       

      In Chelyabinsk, on the first floor of the house opened a branch kindergarten number 85.

      In Traktorozavodsky area on the first floor of the house on the street Yuzhnouralskaya branch opened kindergarten number 85. The municipality bought the two-bedroom apartments that have been converted for preschool in accordance with all sanitary and fire safety requirements.

      In a small and intimate garden will walk 40 children 2 and 3 years. For pupils equipped two groups: games room with heated floors, bedrooms. Purchased the modern bright furniture, toys and sports equipment. Breakfasts, lunches and dinners will bring the kids out of the main building in a sealed industrial vacuum flasks.

      To redevelop the apartments, including the design and maintenance of the city’s budget was sent 5.3 million rubles. Another 600,000 spent on furniture and toys. It turned 4 times cheaper than building a new garden. If there is one place on the organization spent about 150 thousand rubles, that is spent in the construction of about 600,000.

      Photo

Like this post? Please share to your friends: