Perm Engine Company completed the delivery of 3 GTU-10P unit capacity of 10 MW for "Gazprom UGS." By launching this shipment, "PMZ" fully fulfilled its obligations under the contract with "Iskra-Avigaz."
GTU-10P (developer — JSC "Aircraft Engine") is used in the block-complete pumping units in booster compressor stations and underground gas storage GPA-10 BCS "Ural" and GPA-10 UGS "Ural" of JSC "NPO" Iskra ", as well as renovation of existing units GPA-C-6, 3.
Oleg Korolev, commercial director of OJSC "Perm Engine Company", said: "GTU-10P manufactured by JSC" Perm Engine Company "- one of the consistently popular types of our products. During the operation on objects unified gas supply system of Russia GTU-10P proved to be excellent. Today Perm Engine Company produced about 70 GTU-10P to their total operating close to 640 thousand hours. "
Industrial GTU-10Pestablished on the basis of GTU-12P. It is used in the block-complete pumping units in booster compressor stations and underground gas storage GPA-10 BCS "Ural" and GPA-10 UGS "Ural" of JSC "NPO" Spark ", as well as the renovation of existing units GPA-Ts- 6,3, and others. A distinctive feature of the design is a high-speed gas turbine power turbine that provides high-efficiency blower and unified with GTU-12P gas generator. Inherits all the advantages of GTU-12P.
Developer — JSC "Aircraft Engine".
Mass Producer— "Perm Engine Company".
Basic data
(Under ISO, lossless-fuel methane Hu = 11 958 kcal / kg)
Power on the power turbine shaft, MW | 10.26 |
Effective efficiency,% | 32.5 |
Rotational speed of the power turbine / animator / min | 9000 |
Gas temperature CTaboutWith | 463 |
Exhaust gas flow, kg / s | 43.9 |
Life, h: — overhaul — appointed |
25000 100000 |