Premium Engineering develop TEOI to TNK-BP Management

"Premium Engineering" and OJSC "TNK-BP Management" signed an agreement, under which will be developed a feasibility study of investments (TEOI) in the construction of the power plant.
The "TNK-BP Management" involves the construction of its own power generation, integrated into the network infrastructure supply of Ryazan Oil Refining Company (JSC "Republican People’s Party") in order to improve the reliability of power supply.
As part of the contract work, "Premium Engineering" will analyze the existing systems of electricity, steam supply JSC "Republican People’s Party", will form the technical configuration options with the power of raw materials used and the required capacity, identify technological solutions, formulate conclusions and recommendations, will conduct a risk analysis, operational costs, technical, financial and economic indicators, as well as the necessary investment.
"Feasibility study of investments — a key element in the implementation of the project, allowing the initial stage to assess the prospects and risks, work out effective in terms of finance and technical specifications options, identify the strengths and weaknesses of the project — says Alexander Bocharov, CEO of" Premium Engineering . " — TEOI in the construction of power plants for the Ryazan refinery includes a fairly large range of activities, requires consideration of infrastructure component, as well as environmental requirements for the degree of purification of flue gases. Specialists of "Premium Engineering" have a huge experience in drafting a feasibility study of investment, which allows us to implement all phases of the project at the highest level of quality and expertise in full compliance standards TNK-BP. "

Like this post? Please share to your friends: