Reamer upgraded x-ray camera at the COT in Chelyabinsk

The modernization was automated loading window chamber, which allowed a 50% reduction in the time of laying of pipe-laying sites. The project is implemented by a special technical requirements of enterprises, investment was 1.5 million rubles.

The plant "SOT" — Pipe Bend was commissioned in 2004. It is the leading company producing components for the construction of pipelines. Production sites of JSC "COT" are located in the city of Chelyabinsk and Magnitogorsk.

X-ray camera control operational in 2004 with the launch of the plant "COT". Radiographic testing of pipe spools allows the consumer to ensure the reliability of welded joints and precise observance of technology in their manufacture.

In 2012, the company launched new production sites, in particular, the site for the production of stamped tees. Modernization of the chamber will provide one hundred percent control of welded joints of pipe spools in the required amount.

Like this post? Please share to your friends: