Sochi has opened traffic on the section understudy Holiday Avenue

In Sochi, January 27, opened the working traffic on the first line doubler Holiday Avenue. Directorate for construction and reconstruction of roads made it the Black Sea coast at midnight — the movement towards open from Adler to Sochi.

The length of the new section — 5670 meters. On it — three tunnels (one built under Matsestinskaya ridge reaches 1472 meters), four flyovers and two road junctions. On the roadway overpass laid a layer of stone mastic asphalt is resistant to precipitation and constant daily strain. Here we have applied several technological innovations — the latest automated traffic management system, first-class video surveillance systems, automatic methods of speed control. All construction is designed for nine-seismic load.

— The new transport artery of Sochi, which will be provided by the movement of the four bands will resolve many of the difficulties of traffic in the resort town. Implement such a complex project succeeded in preparation of Sochi for the Winter Olympic Games of 2014: the state has gone to the allocation of large loans — said the head of the Federal Road Agency Novel Starovoit.

For motorists, it became possible to move in one-way mode with a stop to the Holiday Avenue near the river Agoura (recreation complex "Sputnik") and exit on the bypass road near the interchange at Strawberry Street. In the opposite direction will be organized one-way traffic — with drive-through tunnel Matsesta.

Like this post? Please share to your friends: