The bridge over the river in Kuzovatovsky Cecere’s Ulyanovsk region was opened after reconstruction

According to experts in the construction of the bridge to apply innovative solutions that have made of high performance buildings. The bridge is a three-bay frame structure made of reinforced concrete, which will reduce the number of expansion joints subject to heavy wear.

Given the characteristics of the geological structure of the site of the bridge, were used to support the foundations of stilt gruntonabivnyh type «Franki». They are characterized by an extremely high load carrying capacity at a relatively low consumption of materials.
"The technology used in the construction of this bridge are aimed at improving traffic safety and load peshehodov.Raschetnye meet modern requirements, bridge walkways and stair assemblies shielded metal railing.

Like this post? Please share to your friends: