The new production facility was opened in the Uralelectromed

Upper Pyshma (Sverdlovsk region)

The new site for repair of equipment buildings opened in a centralized repair service "Uralelectromed" (metallurgical complex UMMC). Now it is being commissioned works — worked through flow diagram.

One of the main objectives of the centralized repair service — this is the reduction of material consumption and increase the lifetime of the equipment. In one workshop has become much easier to plan the work has improved the efficiency of the orders of any complexity, from small sized products to complex industrial projects. The shop has seven production units. Each system was introduced lean manufacturing. For example, all of the equipment is disposed so as to reduce time for transportation of materials.

For a month the service performs about a hundred repairs. Most large-scale projects that are implemented in the past year — the construction of the fifth anode furnace smelting shop, overhaul reverberatory furnace chemical and metallurgical plant, repair of dust abatement equipment briquette factories’ production base metals "(Kirovgrad).

Like this post? Please share to your friends: