The new water intake on the river Frenzy commissioned

The newly built water intake on the river Frenzy put into operation, the press service of the "Olympic" Department of the Krasnodar Territory. Sochi City Administration issued the customer — the Civil Code "the Office Building of the Krasnodar Territory" permission for the facility to operate.

Hydraulic engineering complex, built in the valley of a mountain river, is the highest of all previously handed over such facilities. It is designed for production of 11,000 cubic meters of water per day. Power is provided by twelve wells 40 meters deep, covered pavilions facilities.

As part of the object also built two freestanding tank capacity of 2000 cubic meters of water each. In addition to the elements of proper water intake system, the complex asphalted road, lighting. The facility is also provided with an internal power and water supply, sewerage and storm drains batteries.

In the upper parts of the water intake, stretched out along a mountain river, a dam is built, designed to protect the facility from mudflows. And a mountain river with the speaker called Frenzy facility is fenced off shore protection gabion structure.

Like this post? Please share to your friends: